BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Wallingford, Connecticut. Completed plans call for the renovation of a one-story above grade educational facility.

The scope of work is the Boiler Replacement at Dag Hammarskjold Middle School. Bidders are instructed that registration is required to participate in Bid Events and to access Bid Question and Response information. The Town is seeking a contractor to Remove existing (2) existing boilers & all associated controls and components and install (3) new high-efficiency condensing natural gas-fired boilers Basis of Award: The Town intends to award the bid to the responsive and responsible bidder offering the lowest total cost lump sum cost. Questions concerning the work requirements of this bid are to be submitted through the Purchasing Portal The goal of this project is to furnish needed renovations to the heating boilers and associated systems at Dag Hammarskjold Middle School. This project includes the following elements: demolition; concrete fabrication; boiler installation; burner installation; hydronic heating piping; fuel oil piping; fuel gas piping and specialties work; chimney connector installation; combustion air equipment installation and integration; boiler energy control system installation and integration; associated piping, breeching, electrical and control work; and finish elements, including insulation of new and existing piping, equipment startup and warranty service, and staff instruction. Submitting Contractors shall note the project completion dates and scheduling of this project; penalties shall apply at the Owner's discretion if the Contractor fails to meet these completion dates. The submitting Contractor shall note that this is an active educational facility, and all work shall be performed within the program schedule guidelines of the facility, Wallingford Public Schools, and the Town of Wallingford.

Bid Results

Educational

$845,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,174
Active Projects
668
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 1, 2026

Project location map

106 Pond Hill Rd, Wallingford, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.