Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 9, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of a mixed-use development in Stockton, California. Completed plans call for the renovation of a educational facility.
As of May 08, 2026, the project was awarded to T & S Intermodal Maintenance Inc., DBA T & S West, with an awarded amount of $2,464,071.40. The project consists of kitchen modernization work at the following five sites: Manlio Silva Elementary School, Christa McAuliffe Middle School, Julia Morgan Elementary School, Westwood Elementary School, and George Lincoln Mosher Elementary School. The work at each site may include replacing designated kitchen equipment, removing existing kitchen flooring and installing new commercial kitchen flooring with integral cove base, installing slip-resistant tile flooring over existing concrete slabs, furnishing and installing new serving lines, providing associated utility and finish modifications, installing floor sinks for drainage, conducting FRP wall repairs as required, performing minor painting, and making plumbing, electrical, and mechanical modifications. The scope of work also includes selective demolition, furnishing and installation of new NSF-approved kitchen equipment, sealing and finishing, start-up, testing, cleanup, and coordination with District operations. RFI Due Thursday, March 19, 2026, by 1:00 P.M. All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to Marc Karim, mkarim@lodiusd.net and David Seed, dseed@lodiusd.net. The project consists of kitchen modernization work at the following five sites: Manlio Silva Elementary School - Replace designated kitchen equipment; remove existing kitchen flooring and install new commercial kitchen flooring with integral cove base; furnish and install one (1) new serving line; provide associated utility and finish modifications. Christa McAuliffe Middle School - Replace designated kitchen equipment; install slip-resistant tile flooring over existing concrete slab; furnish and install one (1) new serving line; install floor sink for Combi Oven and iVario drainage; provide associated utility and finish modifications. Julia Morgan Elementary School - Replace designated kitchen equipment; remove existing kitchen flooring and install new commercial kitchen flooring with integral cove base; provide associated utility and finish modifications. Westwood Elementary School - Replace designated kitchen equipment; install slip-resistant tile flooring over existing concrete slab; provide associated plumbing, electrical, and finish modifications. George Lincoln Mosher Elementary School - Replace designated kitchen equipment; remove existing kitchen flooring and install new commercial kitchen flooring with integral cove base; furnish and install one (1) new serving line; provide associated utility and finish modifications. Work generally includes selective demolition, new commercial kitchen flooring, FRP wall repairs as required, minor painting, furnishing and installation of new NSFapproved kitchen equipment, plumbing, electrical and mechanical modifications, sealing and finishing, start-up, testing, cleanup, and coordination with District operations. All work shall comply with applicable codes and District standards and includes a one-year warranty on labor and installation.
Award
Educational
$2,464,071.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
May 29, 2026
Multiple Locations, Stockton, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
