BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Soledad, California. Completed plans call for site work for a sidewalk / parking lot; road / highway; for paving for a road / highway; and sidewalk / parking lot.

The project is located at West Street, from Front Street to 500 feet north of Gabilan Drive. The work consists of pavement rehabilitation, sidewalk and curb ramp replacement, median construction, signing, striping, traffic signal modification, irrigation, and planting. For a full description of the Scope of Work, refer to the attached document. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% The estimated construction cost is $2,575,000.

Award

Roads / Highways

$3,029,693.00

Public - City

Paving, Site Work

40

14

20

8

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
80
Bidding Soon
1,099
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

June 15, 2026

Project location map

West St, Soledad, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.