BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of a water / sewer project in Philomath, Oregon. Completed plans call for the construction of a water / sewer project.

The project consists of a new river intake screen and raw water piping, a new raw water pump station building, improvements to an existing on-site groundwater well, a new 2.0 mgd membrane treatment facility housed in a metal building, new backwash basins, a new high service pump station building, and associated sitework, piping, pumps, and electrical improvements. The membrane filtration equipment and auxiliary power generator for the project have been pre-purchased by the Owner. Bids shall be submitted in a sealed envelope clearly marked with the project name, date, and time of bid closing, as well as the Bidder's name, and delivered to the specified location before the bid closing time. Each bidder must deliver the "First Tier Subcontractor Disclosure Form" to the Project Manager no later than two working hours after bid closing. Failure to submit the required form will render the bid non-responsive. The contract is for a Public Works project and is subject to state and federal prevailing wage laws and all applicable regulations. No prequalification is required for this contract. A mandatory pre-bid meeting and site inspection walk-through is required for all prospective bidders and will be the only opportunity to observe the project site conditions before bid closing. Hard copies of bid documents may be examined at specified locations during their open hours, and digital copies are available for download with a non-refundable payment. Question Deadline 03/26/2026 All questions about the meaning or intent of the Bidding Documents shall be submitted to the Engineer in writing. Questions received less than five (5) days prior to the date for opening of bids will not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications are not binding unless confirmed by written Addendum, including discussions at prebid conferences.

Award

Water / Sewer

$13,880,560.00

Public - City

New Construction, Site Work

203

31

28

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
94
Bidding Soon
1,096
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

June 8, 2026

Project location map

400 S 9th St, Philomath, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.