Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2026 at 8:00 PM
Updated April 4, 2026
Site work for a bridge / tunnel in Tacoma, Washington. Completed plans call for site work for a bridge / tunnel.
This contract provides for the improvement of a culvert crossing on Harts Lake Rd for Brighton Creek to enhance fish passage. The project is funded, in part, by grants from National Oceanic and Atmospheric Administration (NOAA) awarded to the Nisqually Tribe of Indians with Pierce County as a subrecipient. This work will include the installation of a 42' span arch culvert and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. Question Deadline 03/19/2026 at 3:30 PM PT Cost Range: $4,000,000 to $6,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This contract provides for the The Successful bidder will be responsible for construction of the Brighton Creek Culvert Replacement at Harts Lake Rd Project, D462. Work shall be completed in 120 working days following the Notice to Proceed and material procurement period. The onsite Construction window is expected to be between June 2026 through October 2026. This contract provides for the improvement of a culvert crossing on Harts Lake Rd for Brighton Creek to enhance fish passage. The project is funded, in part, by grants from National Oceanic and Atmospheric Administration (NOAA) awarded to the Nisqually Tribe of Indians with Pierce County as a subrecipient. This work will include the installation of a 42' span arch culvert and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The work will include construction below the Ordinary High-Water Mark (OHWM) and a temporary stream diversion. Work below the OHWM shall be completed in the permit specified in-water work windows. Executing the work will require personnel experienced in stream channel construction. The project will follow an Archaeological Treatment Plan to protect cultural resources. An Archaeological monitor will be on-site during key ground-disturbing activities, and the schedule includes extra time to complete these requirements
Bid Results
Bridges / Tunnels
$4,564,565.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2026
June 1, 2026
Harts Lake Rd, Tacoma, WA
Related To This Project
Tacoma, WA
Bid Date: Mar 24 2026
Tacoma, WA
Bid Date: Mar 24 2026
Tacoma, WA
Bid Date: Mar 25 2026
Tacoma, WA
Bid Date: Apr 01 2026
Tacoma, WA
Bid Date: Feb 05 2019
Tacoma, WA
Bid Date: Mar 31 2026
Tacoma, WA
Bid Date: Mar 31 2026
Tacoma, WA
Bid Date: Apr 01 2026
Tacoma, WA
--
Tacoma, WA
Bid Date: Mar 24 2026
Tacoma, WA
Bid Date: Mar 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
