BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

Site work for a bridge / tunnel in Tacoma, Washington. Completed plans call for site work for a bridge / tunnel.

This contract provides for the improvement of a culvert crossing on Harts Lake Rd for Brighton Creek to enhance fish passage. The project is funded, in part, by grants from National Oceanic and Atmospheric Administration (NOAA) awarded to the Nisqually Tribe of Indians with Pierce County as a subrecipient. This work will include the installation of a 42' span arch culvert and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. Question Deadline 03/19/2026 at 3:30 PM PT Cost Range: $4,000,000 to $6,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This contract provides for the The Successful bidder will be responsible for construction of the Brighton Creek Culvert Replacement at Harts Lake Rd Project, D462. Work shall be completed in 120 working days following the Notice to Proceed and material procurement period. The onsite Construction window is expected to be between June 2026 through October 2026. This contract provides for the improvement of a culvert crossing on Harts Lake Rd for Brighton Creek to enhance fish passage. The project is funded, in part, by grants from National Oceanic and Atmospheric Administration (NOAA) awarded to the Nisqually Tribe of Indians with Pierce County as a subrecipient. This work will include the installation of a 42' span arch culvert and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The work will include construction below the Ordinary High-Water Mark (OHWM) and a temporary stream diversion. Work below the OHWM shall be completed in the permit specified in-water work windows. Executing the work will require personnel experienced in stream channel construction. The project will follow an Archaeological Treatment Plan to protect cultural resources. An Archaeological monitor will be on-site during key ground-disturbing activities, and the schedule includes extra time to complete these requirements

Bid Results

Bridges / Tunnels

$4,564,565.00

Public - County

Site Work

51

19

11

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
2
Bidding Soon
949
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

June 1, 2026

Project location map

Harts Lake Rd, Tacoma, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.