BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a transportation facility in Miami, Florida. Completed plans call for the renovation of a transportation facility.

The work includes, but is not limited to, removing and installing seventy-one (71) new fire-rated three-hour (3-hour) stainless steel doors, frames, and hinges, including all necessary hardware. Door, frame, and hardware must have the same three-hour fire-resistance rating. The contractor is responsible for ordering the new door with the same lock configuration as the existing door and for obtaining a permit from the Miami-Dade Building Department. Sixty-six (66) single doors and five (5) double doors need to be replaced, for a total of seventy-one (71) doors. All doors shall be 7 feet (84 inches) tall and match the existing door width. A stainless-steel transom will be installed above the doors to close the opening completely. The doors must have NOAs and be approved under the Florida Building Code. The contractor is responsible for measuring each Metro Rail and Metro Mover station door that will be replaced. Only saw tools will be used to remove existing doors and make cutouts. The work must comply with the requirements of the Federal Transportation Administration and all related requirements, including Civil Rights Act, Buy America provisions, Davis Bacon Wage, and all other relevant standards. Contractors must hold valid, current, and active State and/or Miami-Dade County contractor's licenses consistent with the requirements of the scope of work. Bidders must have verifiable experience installing commercial metal doors. The work must comply with the Standard for Fire Doors and Other Operating Opening Protections outlined in NFPA 80, required for three-hour fire doors. Any deviation could compromise the safety and functionality of the doors. All interested contractors must attend a mandatory site visit to gain a comprehensive understanding of the project scope and conditions. Contractors who do not attend will not be excused from any information or details that are visibly apparent or discussed during the visit. It is the contractor's responsibility to be aware of all relevant site conditions. Pre-Bid Meeting 03/19/2026 at 10:00 AM Site Walkthrough 03/24/2026 at 10:00 AM All RFI requests should be e-mailed to Laura.Hernandez@miamidade.gov while copying the Clerk of the Board (clerkbcc@miamidade.gov).

Post-Bid

Transportation Terminals

$1,392,760.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

63

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2026

July 8, 2026

Project location map

Multiple Locations, Miami, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.