Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 13, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of a mixed-use development in Lexington, South Carolina. Completed plans call for the renovation of a medical facility; and municipal facility.
As of April 13, 2026, the project has been awarded to the following: Batesburg Health Center Roof - Southern Roofing Services, Inc. (Sumter, South Carolina) $56,400.00 Summary Court Roof – Roofing Professionals, LLC (Lexington, South Carolina) $283,900.00 The following scope of work does not indicate the sequence in which the roof should be installed. 1. General a. Contractor is to verify that all roof drains, scuppers, and downspouts are free of debris and free flowing prior to the start of work and at the end of the project. Owner and Consultant are to be notified of any drainage related issues. 2. Roof Areas A through H a. Remove and dispose of the existing roofs down to the structural concrete deck. b. Remove and dispose of the existing base flashings. c. Remove and dispose of the existing metal counterflashings. d. Remove and dispose of existing metal caps over curbs. e. Remove and dispose of existing overflow scupper flashings. f. Remove and dispose of the existing skylights. g. Replace the existing gravity vents as specified in Section 233723 "HVAC Gravity Vents". h. Remove and dispose of the existing roof drains. i. Inspect the structural concrete deck and ensure it is free of moisture and debris before starting roof installation. j. Install 18-gauge steel plates over deck openings; the steel should becantilevered 24" on all sides and fastened in place 6" on center. k. Adhere a 2-inch base layer of polyisocyanurate insulation in low-rise adhesive to the structural concrete deck. l. Install a second layer of 2-inch polyisocyanurate insulation in low-rise adhesive, or 1/4 -inch-per-foot tapered insulation where indicated on the drawings. m. Adhere a 1/2 " cover board in low-rise adhesive. n. Sheath parapet walls that exceed 24" in height with 1/2 " gypsum cover board. o. Fully adhere a fleece-backed 60 mil PVC KEE membrane in low-rise adhesive (60 mil nominal, not including the fleece). p. Fully adhere 60 mil PVC KEE membrane base flashings in low-VOC adhesive. q. Install new PVC KEE accessories (i.e., flashing boots). r. Install new metal counterflashings. s. Install 3/4 " plywood, roof insulation, and cover board over the existing capped curb and skylight locations; install new metal caps (construction to match new roof assembly). t. Install new overflow scupper flashings and raise them if necessary. u. Install new edge metal secured to the top of the masonry coping, so that the front face of the masonry coping is still visible from the ground. v. Install new roof drain assemblies; 4-band no-hub couplings at the drain outlets are required. w. All curbs, pipes, and interior walls must be raised to accommodate 8" of flashing height. x. After all work is complete, thoroughly clean the roof surface of debris and footprints. y. Contractors are responsible for disconnecting and reconnecting applicable equipment and are instructed to use only qualified, licensed personnel where applicable. z. Provide the owner with a 20-year non-prorated labor and material warranty. Location - 229 W. CHURCH STREET, BATESBURG-LEESVILLE, SC 29006. 139 E. MAIN STREET, LEXINGTON, SC 29072. Question Cut Off Date 3/20/2026 12:00:00 PM (ET) All Questions Regarding This Solicitation Must Be Submitted electronically.
Award
Municipal
$56,400.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2026
April 27, 2026
Multiple Locations, Lexington, SC
Related To This Project
Lexington, SC
Bid Date: Apr 14 2026
Lexington, SC
Bid Date: Apr 03 2026
Lexington, SC
Bid Date: Apr 15 2026
Lexington, SC
Bid Date: Mar 31 2026
Lexington, SC
Bid Date: Apr 28 2026
Lexington, SC
Bid Date: Jun 03 2026
Lexington, SC
Bid Date: Apr 27 2026
Lexington, SC
Bid Date: Apr 24 2026
Lexington, SC
Bid Date: Mar 25 2026
Lexington, SC
Bid Date: Mar 19 2026
Lexington, SC
Bid Date: Mar 20 2026
Lexington, SC
Bid Date: Mar 10 2026
Lexington, SC
Bid Date: Mar 27 2026
Lexington, SC
Bid Date: Mar 06 2026
Lexington, SC
Bid Date: Mar 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
