BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Site work for a water / sewer project in Madison, Wisconsin. Conceptual plans call for site work for a water / sewer project.

Dane County Waste + Renewables (W+R) is seeking proposals from professional engineering firms to serve as the Construction Quality Assurance (CQA) Representative at Dane County Landfill Site No. 3, specifically for the "Phase 1, Cell 1 Liner Construction." The scope includes providing on-site CQA representatives; conducting soil sampling and testing; performing geosynthetic sampling and testing; and submitting all reports and documentation to the Wisconsin Department of Natural Resources (WDNR) necessary for approval of landfill construction events. CQA representatives are required to be present at relevant meetings, conduct weekly erosion control inspections, coordinate sampling and testing to avoid construction delays, and develop and implement all required plans per the referenced CQA Plan. All testing, coordination, and reporting costs are the responsibility of the selected firm. Minimum requirements include at least one registered professional engineer for WDNR reporting, certified testing equipment, and a certified four-wheel drive vehicle for on-site navigation. Proposers must also organize and submit their proposals as specified, including all required documentation, certifications, and responses to the evaluation criteria, all in compliance with the RFP instructions and submission guidelines. Proposals must be submitted electronically via the County's eProcurement Portal following all listed steps and requirements. The primary Scope of Work for this project is to represent W+R during the construction of Dane County Landfill Site No. 3 - Phase 1, Cell 1 Liner Construction. During the construction, W+R requires the following services: on-site CQA representative(s), soil sampling and testing, geosynthetic sampling and testing, and reporting to WDNR. Question Submission Deadline March 24, 2026, 5:00pm All inquiries concerning this RFP must be submitted via the County's eProcurement Portal. Question Response Deadline March 26, 2026, 5:00pm The contract will be effective on the execution date indicated on the Professional Services Agreement. The term shall be for a maximum of five (5) years from the Agreement execution date or project completion. Interview, if necessary (estimated):April 6, 2026 Notification of Intent to Award (estimated):April 8, 2026 Agreement Start Date (estimated):May 26, 2026 The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$3,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
4
Bidding Soon
1,608
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

May 26, 2026

Project location map

4402 Brandt Rd, Madison, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.