BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 16, 2026

Site work, paving and outdoor lighting for a civil project in Seffner, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; bridge / tunnel; bridge / tunnel; and for outdoor lighting for a road / highway.

The Improvements under this Contract consist of roadway auxiliary lane widening, median barrier improvements, minor drainage improvements, bridge widening, signing and pavement marking improvements, lighting improvements, and ITS improvements on EB SR 400 (I-4) from 15th Street to West of 26th Street in Hillsborough County Prequalification required. Total Roadway Length: 0.721 Miles Total Bridge Length: 0.068 Miles Total Proposal Length:0.789 Miles Question Deadline 05/06/2026 - Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online FDOT - 001 - Interchange - Add Lanes - SR 400 (I-4)

GC Bidding

Roads / Highways

$12,566,375.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

154

6

6

4

Subscribe For Documents

128 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
140
Bidding Soon
2,076
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.