BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a fitness / recreation center in Cottleville, Missouri. Completed plans call for the renovation of a fitness / recreation center.

*As of 3/18/2026 no bids were received for this project. No additional information is available at this time. The City of O'Fallon, Missouri is soliciting bids for services related to Renaud Center Dectron Duct Work. Specifications are available at www.ofallonmo.gov under Bid Opportunities. Interested vendors should submit sealed bids clearly marked "Bid #26-022 Renaud Center Dectron Duct Work" to the City of O'Fallon, Attn: Christine Grabin, Purchasing Agent, 100 North Main Street, O'Fallon, MO 63366, by 2:30 P.M. CDT, March 18, 2026. The City of O'Fallon reserves the right to reject any and all bids and waive any irregularities. The City of O'Fallon also reserves the right to select the lowest and/or best bidder as determined by the City in its sole discretion. Question Deadline 03/11/2026 at 12:00 PM CT Questions Should Be Submitted in Writing via E-mail to the Purchasing Agent. Purchasing Agent: Christine Grabin Phone: 636.379.5527 E-mail: Cgrabin@ofallonmo.gov The City of O'Fallon is seeking bids to replace the outside duct work for the supply and return on our Dectron pool unit. Project Location: Renaud Center 2650 Tri Sports Circle O'Fallon, MO 63368 Contractor shall provide all labor, materials, equipment, supervision, and permits necessary to complete the work as specified herein. Contractor will be responsible for the following: o Removal and disposal of existing exterior duct work. o Associated new duct work to complete replacement project. o Associated hangers to complete replacement project. o Duct work to be internally insulated. o Labor to complete during normal working hours. o Associated permits and/or permit fees. Bidders shall provide the following separate pricing: 1. Base Bid: Replacement of both exterior supply and return ductwork. 2. Alternate No. 1: Exterior supply ductwork replacement only. 3. Alternate No. 2: Exterior return ductwork replacement only. Pricing shall clearly identify labor and material costs associated with each alternate. o Ductwork shall be constructed of galvanized sheet steel meeting SMACNA HVAC Duct Construction Standards. o Minimum duct gauge shall comply with SMACNA requirements based on duct size and system static pressure. o As a general guideline: 22-24 gauge for main trunks 24-26 gauge for branch ducts o Contractor shall verify static pressure and airflow requirements of the existing Dectron LD-282 unit prior to fabrication. o All transverse joints and longitudinal seams shall be mechanically fastened and sealed. o Contractor shall field verify all dimensions prior to fabrication. o Duct work shall be internally insulated. o Internal insulation shall be: o Minimum 1" thick duct liner (or greater if required by code) o Moisture-resistant type suitable for high-humidity natatorium environments o Rated for use in air handling systems o Insulation edges shall be sealed to prevent air erosion or moisture intrusion. o Adhesives, pins, and fasteners shall be corrosion resistant. o Installation methods shall prevent vapor migration and condensation damage

Bid Results

Fitness / Rec Centers

$35,656.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
156
Bidding Soon
1,616
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

May 18, 2026

Project location map

2650 Tri Sports Circle, Cottleville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.