Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2026 at 8:00 PM
Updated April 4, 2026
Renovation of an educational facility in Taylorsville, Utah. Completed plans call for the renovation of a educational facility.
The purpose is to seek bids from responsive and responsible contractors to remove and replace lockers in the Women's Locker Room at Taylorsville High School according to the specified requirements, drawings, and bid form. It is anticipated that this will result in a single award. The package can be downloaded from DemandStar Corporation at http://www.demandstar.com. General: Lockers shall be manufacture's heavy-duty metal construction. Fabricate lockers square, rigid and without warp, with metal faces flat and free from dents or distortion. Make all exposed metal edges safe to touch. Weld frame members together to form rigid, one-piece structure. Weld, bolt, or rivet other joints and connections as standard with manufacturer. Grind exposed welds flush. Do not expose bolts or rivet heads on fronts of locker doors or frames except for fastening of number plates and recessed handle. Finishing: All locker parts to be cleaned and coated after fabrication with a seven-stage zinc/iron phosphate solution to inhibit corrosion, followed by a coat of high-grade custom blend powder electrostatically sprayed and baked at 350 degrees Fahrenheit for a minimum of 20 minutes to provide a tough durable finish. Color to be selected from manufacturer's standard list of colors. Interior components to be painted. Two-Tone Color Combination: Shall be at no additional cost with the locker frame and trim chosen from one color and the doors may be one of any other color chosen from manufacturers standard selection. Frame: Fabricate of 16-gauge (minimum) channels, with integral continuous door stop/strike formed on both latch and hinge side vertical members. Cross frame members of 16-gauge channel shapes, including intermediate cross frame members on double and triple tier (frames with doors over 18" high) lockers shall be securely welded to the vertical framing members to ensure rigidity. Rubber bumpers shall be provided to cushion door closing. Standard KD Wardrobe Doors: Doors 20" high and over to be fabricated from single sheet prime 14 gauge (18 gauge for doors 9" wide as well as Two-Person and Duplex doors) with single bends at top and bottom and double bends at the sides. The channel formed by the double bend at the latch side is designed to fully conceal the lock bar. Doors shall be louvered. Upper compartment doors of TwoPerson shall be plain (non-louvered). Standard KD Box Doors: Doors 18" high and under to be fabricated from single sheet prime 18 gauge with single bends at top, bottom, and sides. Doors shall include a combination friction catch door pull. Padlock Strike Plates are optional. Doors shall be fabricated to accept a built-in combination lock or padlock. Doors with projecting spring latches shall not be acceptable. Doors shall be louvered. Stainless Steel Recessed Locker Handle: All wardrobe doors shall have a deep-drawn, seamless, recessed, not less than 304 stainless steel handles shaped to receive a padlock or built-in combination lock. The recess pan shall be deep enough to have the lock be flush with the outer door face. Box doors shall be equipped with a combination friction catch door pull as stated above.
Award
Educational
$101,445.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 23, 2026
June 15, 2026
5225 S Redwood Rd, Taylorsville, UT
Related To This Project
Taylorsville, UT
Bid Date: Mar 25 2026
Taylorsville, UT
Bid Date: Mar 03 2026
Taylorsville, UT
Bid Date: Mar 16 2026
Taylorsville, UT
Bid Date: Feb 24 2026
Taylorsville, UT
--
Taylorsville, UT
Bid Date: Mar 25 2026
Taylorsville, UT
Bid Date: Feb 04 2026
Taylorsville, UT
Bid Date: Feb 10 2026
Taylorsville, UT
Bid Date: Jan 27 2026
Taylorsville, UT
Bid Date: Nov 10 2025
Taylorsville, UT
Bid Date: Nov 06 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
