BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a mixed-use development in Altamonte Springs, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, pedestrian or bicycle special detour, arrow board, PCMS, signalization and maintenance, traffic detection and maintenance, barricade), protections (sediment barrier, inlets), earthwork (excavation), base course, asphalt (milling, resurfacing), friction course, concrete (curb and gutter, sidewalk, ditch pavement), pavement markings (detectable warnings, painted, thermoplastic, permanent tape, RPM), signing (single-column, panel, panel remove, tubular marker), signalization (cable F&I, cable remove, aluminum pole pedestal, aluminum pole remove, pedestrian signal, pedestrian detector, controller), electrical (conduit, pull/splice box,) and sod along State Road 436 from Lake Howell Road to the Orange County Line for 2.105 miles in Seminole County. Prequalification required. Total Roadway Length: 2.070 Miles Total Bridge Length: 0.035 Miles Total Proposal Length:2.105 Miles Question Deadline 03/31/2026 - Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online FDOT - 001 - Resurfacing - SR 436

Award

Roads / Highways

$5,792,914.00

Public - State/Provincial

Paving, Site Work

289

7

7

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
142
Bidding Soon
1,904
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

June 8, 2026

Project location map

FL-436, Altamonte Springs, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.