BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a road / highway in Lethbridge, Alberta. Completed plans call for site work for a road / highway.

Lane segments are inspected on a cyclical basis and assigned a condition index. Using this index, along with maintenance history and service requests, a group of lanes have been identified for surface rehabilitation. The objective is to reduce ongoing maintenance costs and improve overall condition rating of the lane network. The Contractor is to provide all labour, equipment, and materials necessary to rehabilitate the selected paved lanes in accordance with project specifications, standards and approved designs. The Contract will complete the following work for each designated lane: Remove and dispose of existing surface material Remove, replace, or rework base materials to improve drainage performance and structural integrity Install or adjust drainage infrastructure as specified or as required to meet design intent Perform all required concrete work, including but not limited to swales, aprons, and related components. Pave each lane to the specified standards The Contractor shall coordinate with all utility owners whose infrastructure may be affected by the rehabilitation work. Responsibilities include: Removing existing surface as required to facilitate utility work Maintain prescribed proximity distances &/or manage utility protection as required If applicable, once utility work is finished, complete rehabilitation per designs and standards. The Contractor will maintain ongoing communication with all relevant stakeholders, including: Adjacent property owners and occupants regarding planned work, scheduling, access, safety, waste collection, and other impacts Private and City Waste & Recycling services to arrange alternate pick-up locations, timelines, reinstatement of regular service The City’s Right-of-way Coordinator, as required Any additional parties as circumstances require Provide traffic accommodation measures as required. Obtain all necessary excavation permits prior to commencing work. Preserve all survey monuments located within or adjacent to the work area, including property markers and Alberta Survey Control Monuments. Documents can be obtained from https://lethbridge.bidsandtenders.ca/ Bid values are undisclosed.

Award

Roads / Highways

$1,000,000.00

Public - City

Site Work

22

15

15

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
21
Bidding Soon
196
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2026

May 4, 2026

Project location map

Multiple Locations, Lethbridge, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.