BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2026 at 8:00 PM

Updated March 11, 2026

Site work for a water / sewer project in Coppell, Texas. Completed plans call for site work for a water / sewer project.

The scope of work includes furnishing, installing, and providing all labor and materials required for construction of water, wastewater, and storm drainage utilities, as well as miscellaneous items, for Preston Harbor Minor Arterial Roadway. For all Preston Harbor Master Infrastructure and Pod 6 Phase 1, award will be based on price and duration. Construction plans are bid documents only until signed and sealed by the engineer and watermarked by the City of Denison. Please see utilities duration on Bid Quantities. All construction plans are for bidding purposes only.

Sub-Bidding

Water / Sewer

$5,000,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
450
Active Projects
225
Bidding Soon
4,035
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

May 8, 2026

Project location map

To be determined, Coppell, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.