BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a transportation facility in Evergreen, Alabama. Completed plans call for site work for a transportation facility.

Furnish all labor, materials, and equipment and perform all necessary work for Taxiway 10/28 Rehabilitation at Evergreen Regional Airport at Middleton Field. Major items of work include: Taxiway Rehabilitation with a 4-inch mill, 3.5-inch Asphalt Surface Course overlay using ALDOT mix, and a G Treatment for the entire Taxiway 10-28, including leveling, taxilane widening, and fillet construction. There is also an additive bid for a taxiway sealcoat. Each proposal must be accompanied by a bid guaranty in the amount of five percent of the total bid, not to exceed $50,000, by certified check or bid bond payable to the City of Evergreen. Bidders bidding amounts exceeding the threshold established by the State Licensing Board for General Contractors must be licensed under Title 34, Chapter 8, Code of Alabama, 1975, and must display the license number on the outside of the proposal envelope. A Heavy and Railroad major or specialty license is required to bid as prime for this project.

Post-Bid

Transportation Terminals

$2,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
81
Bidding Soon
1,029
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

May 18, 2026

Project location map

355 East Front Street, Evergreen, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.