BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Fort Morgan, Colorado. Completed plans call for the renovation of a educational facility.

**As of May 4, 2026, the project was awarded to Happel & Associates, Inc but the awarded amount is not available.** Reference Number 0000416081 Bid Intent Not Available The State of Colorado, Morgan Community College (MCC) is soliciting bids from qualified contractors for 2026-101 STEM Project Renovations and 2026-102 Mi Casa Career Center. Background: MCC is soliciting bids for two separate projects, each funded in whole or in part with federal grant dollars. Although these projects are independently funded, they are being advertised, contracted, and managed concurrently due to their shared project schedule and coordinated completion requirements of being fully complete, expended, and closed-out by September 30th, 2026, with STEM Project Renovations completed by July 31st, 2026, for the start of the '26 Fall semester. Due to this consideration, MCC intends to award these two projects to the same contractor. However, bidders must provide bids for each project separately and contracts will be awarded on cumulative bid totals. 2026-101/STEM Project Renovations: Three science labs renovation and classroom renovation to house MCC's STEM Studio. The comprehensive scope includes the installation of high-performance laboratory fume hoods with integrated service fixtures, new wood laboratory casework (including acid storage), essential safety equipment like emergency eyewashes, and new finishes throughout. To support these upgrades, the project requires extensive infrastructure work, including specialized laboratory exhaust ductwork, precise HVAC system balancing (TAB), and the coordination of all new plumbing and electrical connections. 2026-102/Mi Casa Career Center: Renovation of current MCC 'Welcome Center,' transforming the current space into Career Center and newly constructed Welcome Center, as well as updates to the adjacent Learning Commons. The comprehensive scope involves renovation of the existing administration wing and library to create a contemporary, new student services wing, including renovated Welcome Center with upgraded service desks, lobby, and work areas, new Career Center offices and lobby, and reorganized library space featuring new offices, an archives room, and an updated service desk. The scope encompasses complete interior refinishing--including new glass storefront systems, architectural wood paneling, ceilings, and flooring alongside a total overhaul of the facility's critical infrastructure, including high-efficiency HVAC systems, upgraded electrical and lighting controls, and modernized fire suppression and security systems. Buyer Preferences, Guidelines & Requirements General Requirements - Bidder Prequalification/Preregistration Required - Certified Payroll - Federally Funded - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 5 % - Labor and Materials Bond 5 % Question Deadline 03/23/2026 at 2:00 PM MT Questions are submitted online No, Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule. POINT OF CONTACT/CLARIFICATION Name: Chloe Hirschfeld Agency: Morgan Community College Email Address: chloe.hirschfeld@morgancc.edu Phone: 970-542-3126 The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information. *Roche Constructors Inc - Greeley (HQ) requests subcontractor bids by 5:00 PM MDT on April 6, 2026.

Award

Educational

$300,000.00

Public - State/Provincial

Renovation

66

34

51

6

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
126
Bidding Soon
1,544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

April 30, 2026

Project location map

920 Barlow Rd, Fort Morgan, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.