BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work and paving for a bridge / tunnel in Millvale, Pennsylvania. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Part Name: PE for Klopfer Street Bridge Project Description: Preliminary engineering services may include, but not be limited to the following: ASTA design and pre-bid construction schedules, scoping field view (SFV), research of background drawings/information, research of required permits, field survey, preliminary roadway design, preliminary drainage design, line and grade submission, safety review, geotechnical investigation/engineering, structure borings, preliminary type, size, and location (TS&L) plan/report, hydrologic and hydraulic (H&H) study/report, public involvement, environmental documentation, utility coordination and Subsurface Utility Engineering (SUE), preliminary right-of-way (ROW) investigation/plan, preliminary maintenance and protection of traffic (MPT), preliminary signing and pavement markings, and constructability/maintainability review. Anticipated NTP: 06/01/26 Part Name: FD for Klopfer Street Bridge Project Description: Final design services may include, but not be limited to the following: ASTA design and pre-bid construction schedules, preparation and approval of interagency permits and erosion and sedimentation (E&S) control permit, supplemental survey, drainage design, roadway design and plan development, structure design and plan development, safety review, foundation design/reports, final type, size and location (TS&L) plan/submission, utility coordination, right-of-way negotiation and acquisition services as required, constructability/maintainability review, final plans (roadway, cross sections, E&S, structure, right-of-way, Maintenance and Protection of Traffic (MPT), signing and pavement marking), construction cost estimate, and a Plans, Specifications & Estimate (PS&E) package. Anticipated NTP: 06/01/27 Part Name: Services during Const. for Klopfer Street Bridge Project Description: Services during construction may include, but not be limited to: shop drawing review, preparation of as-built drawings, and consultation during construction. Anticipated NTP: 06/01/28 Part Name: Other admin. activities for Klopfer Street Bridge Project Description: Other administrative activities for unforeseen work as directed by the project manager. Anticipated NTP: 06/01/27 The method of contractor selection has not been determined at this time. PA DOT - RFQ Engineering - Klopfer Street Bridge Over Girty's Run

Conceptual

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
8
Bidding Soon
1,133
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2027

Project location map

Klopfer St, Millvale, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.