BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a transportation facility in Abbotsford, British Columbia. Completed plans call for site work for a transportation facility.

**As of May 19, 2026, the project was awarded to Emil Anderson Construction (EAC) Inc., with an awarded amount of $4,709,311.40** The Runway 07/25 Runway End Safety Areas (RESAs) and Pavement Repairs (the project) is scheduled for completion at the Abbotsford International Airport (CYXX) between mid-April and June 2026. Abbotsford International Airport is required by regulation to implement RESAs on Runway 07-25 by no later than June 30, 2026, and as such the pavement repairs completed within the same timelines. RESAs are defined surfaces that extend beyond the end of the runway to minimize the risk of damage to an aircraft in the event of an undershoot (landing short of the runway) or an overrun (exceeding the runway length). The RESA scope of work generally includes soil stripping, common excavation and disposal, granular backfill, topsoil reuse, hydroseeding, and minor airfield electrical modifications and existing underground utility protections. The RESA works are being combined with pavement repairs for Runway 07/25. The pavement repair areas are broken into three work areas: Threshold 07, Runway 07/25 at Taxiway D, and Runway 07/25 at Taxiway C1. The scope of work differs by location but generally includes select concrete panel removal and replacement, asphalt cold milling and asphalt paving, mastic maintenance measures, joint sealant removal and replacement, and replacement pavement markings. The project works are phased into work zones as communicated on the construction sequencing drawings and the Plan of Construction Operations (PCO) document – Appendix K. These include temporary facilities and daytime and nighttime construction shifts. All work will be completed on the airfield of CYXX. The airfield will remain active for most of the construction activities, with localized closures to facilitate the work. Specific entry points, gate guards, and airside escorts will be a component of the work as outlined in the PCO. Documents can be obtained from https://abbotsford.bidsandtenders.ca/

Award

Transportation Terminals

$4,709,311.00

Public - City

Site Work

19

23

38

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
127
Bidding Soon
2,478
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

April 20, 2026

Project location map

30440 Liberator Ave, Abbotsford, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.