Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 14, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a multi-residential development in Haleyville, Alabama. Completed plans call for the renovation of a multi-residential development.
Bids are requested for HVAC replacement at Project AL 09PO56006 # 1 for the Haleyville Housing Authority, located at 2601 Newburg Rd, Haleyville, Alabama. Bids must be submitted in a sealed envelope with specific labeling, using forms provided by the architect, and accompanied by a certified check or bid bond of at least 5% of the base bid. The successful bidder must provide a Performance Bond and Payment Bond, each for 100% of the contract. The contract is a lump sum Prime Contract for General Construction. Bidders must hold a "commercial contractor" license, and all bid envelopes must list the contractor's certificate of responsibility number on the outside. Bids must comply with equal employment opportunity provisions and minimum wage requirements. No bid may be withdrawn within 45 days of opening, and the Owner reserves the right to reject any or all bids and to waive formalities and informalities. Question Deadline 04/02/2026 Any prospective bidder desiring an explanation or interpretation of the solicitation , specifications, drawings , etc., must request it at least 7 days before the scheduled time for bid opening . Repair all areasof the site damaged during construction including but not limited to ruts , concrete , etc ..... Building Interior /Exterior : Demo /remove existing hvac system including but not limited to furnace , condenser, grilles ,refrigerant lines, condensatelines (asrequired ), combustion air ,etc... Existing duct plenum in hall ceiling to be abandoned in place. Demo/remove all existing sidewall supply grilles at walls/plenum. Where existing sidewall supply grilles at walls areremoved,patchhole with gypsum wall board (match existing thickness ). Finish to match adjacent surface and paint entire wall from corner to corner, floor to ceiling . Typical at all grilles . Install new completehvac equipment including but not limited to air handler, cooling coil , condenser , ductwork , line sets, grilles , etc. Paint all interior surfaces of the mechanical closet (gysum board , plywood and wood ) with mold resistant paint .
Bid Results
Multi-Residential
$560,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
May 11, 2026
2601 Newburg Rd, Haleyville, AL
Related To This Project
Haleyville, AL
Bid Date: Apr 03 2026
Haleyville, AL
--
Haleyville, AL
Bid Date: Sep 24 2025
Haleyville, AL
Bid Date: Jul 30 2025
Haleyville, AL
Bid Date: May 29 2025
Haleyville, AL
Bid Date: May 07 2025
Haleyville, AL
Bid Date: Feb 13 2025
Haleyville, AL
Bid Date: Feb 06 2025
Haleyville, AL
--
Haleyville, AL
Bid Date: Sep 03 2024
Haleyville, AL
Bid Date: Sep 03 2024
Haleyville, AL
Bid Date: Jun 26 2024
Haleyville, AL
Bid Date: Jun 06 2024
Haleyville, AL
Bid Date: May 22 2024
Haleyville, AL
Bid Date: Oct 27 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
