Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 5, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a sidewalk / parking lot in Dallas, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Specification All construction work for this project shall be performed in accordance with the Texas Department of Transportation, 2024 Standard Specifications for Construction of Highways, Streets, and Bridges, Construction Details; County of Dallas Special Provisions to the Standard Specifications; and Special Specifications. See Exhibits A, B, C, & D 1. Demolition and Site Preparation: a. Removal of approximately 11,150 square yards of asphalt pavement and base layers (approx. 10" depth). b. Removal of 42 square yards of concrete pavement. c. Temporary removal and storage of 18 concrete curb stops. d. Removal of 12 six-inch pipe bollards. e. Removal of 975 linear feet of concrete curb and gutter. f. Temporary removal and storage of 491 linear feet of wrought iron fence, including two key pads, a solar panel, and gate operator and motor for reinstallation. 2. Parking Lot Pavement and Drainage: a. Subgrade preparation to an 8-inch depth across 11,351 square yards, including lime treatment. b. Installation of 8.5-inch-thick TxDOT Type A flex base compacted pavement with 2.5-inch HMAC surface. c. Construction of 1,013 linear feet of 6-inch concrete curb and gutter. d. Reinstallation of 18 concrete curb stops and 12 six-inch pipe bollards. e. Installation of 821 linear feet of UB 24-2 Universal Tree Root Barrier along back of curb. f. Reinstallation of 491 linear feet of wrought iron fence with new posts, reusing existing fence panels, along with two key pads, solar panel, and gate operator and motor. Source ID PU.AG.USA.2438.C21221001 Reference Number 0000416333 Piggyback Contract No Question Acceptance Deadline 04/09/2026 03:00 PM CDT Questions are submitted online Yes - Bid Bond 5 %
Post-Bid
Sidewalks / Parking Lot
$400,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2026
May 25, 2026
1300 W Mockingbird Ln, Dallas, TX
Related To This Project
Dallas, TX
Bid Date: Sep 23 2019
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Apr 07 2026
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: May 07 2026
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Apr 17 2026
Dallas, TX
--
Dallas, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
