BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work and paving for a road / highway in Pleasant Grove, Alabama. Working plans call for site work for a road / highway; and for paving for a road / highway.

Railroad Crossing Improvements: Replace Existing Cantilevers, Gates, Lights, Signals and Install Markings, Guardrail, Pedestrian Crossing, and Wheelchair Ramp at Sr-7 (Us-11/1st Ave) and Norfolk Southern Railroad, Dot No. 728048s, Ref. No. 1626 Type of Work : RR Crossing Improvements Project Length in Miles 0.000 County: Jefferson Route SR 7 As of March 13, 2026, the project is in Final Planning status. Anticipated letting Year is 2026. ALDOT - Railroad Crossing Improvements - SR-7 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$660,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
51
Bidding Soon
698
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Multiple Locations, Pleasant Grove, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.