BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in New Braunfels, Texas. Conceptual plans call for site work for a water / sewer project.

Members and Customer have experienced and/or are currently experiencing rapid growth and increased water demands and are currently planning Capital Improvements that will provide more operational capabilities and flexibilities in their individual systems. CRWA is in need of an Operational Master Plan that will treat the individual systems and the CRWA system as one and provide an operational strategy. The selected Firm will be responsible for developing a comprehensive Operational Master Plan that identifies and defines strategies to effectively accommodate the needs of all CRWA Members and its Customer served by each CRWA facility. The scope of services for each facility includes, but is not necessarily limited to, analysis of existing water system infrastructure; study of current water demands and operational patterns; evaluation of projected water demands; recommendations for immediate improvements to improve system efficiency and reliability; assessment of all water resources currently available; development of an operational strategy to maximize service reliability and consistency; assessment of planned capital improvement projects; evaluation of timelines for capital improvements; development of a comprehensive schedule identifying all improvements and their impacts; development of a comprehensive Operational Master Plan including all current demands and recommendations for operational strategies; and presentation of the OMP to Owner, Member, and Customer governing bodies. Respondents are to submit five hard/paper copies of the SOQ and a searchable PDF copy on a flash drive in the same envelope as the hard copies. All SOQ submissions shall be enclosed in a sealed and plainly marked envelope and delivered to the Canyon Regional Water Authority on or before the date and time set to receive the SOQ submission. It is the responsibility of the respondent to ensure mailed SOQ submission is received on or before the due date. CRWA reserves the right to reject any or all SOQ submittals.

Conceptual

Water / Sewer

$500,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

June 1, 2026

Project location map

To be determined, New Braunfels, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.