BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of a water / sewer project in Boca Raton, Florida. Completed plans call for the construction of a one-story above grade water / sewer project; and for site work for a water / sewer project.

The work consists of furnishing all materials, labor, supervision, equipment, supplies, fees, expertise, and services necessary to construct a new reclaimed pump station on Lyons Road just north of Glades Road. The pump station will be a single-story building that includes new split case pumps with associated piping, valves, instruments, and accessories. Sealed bids must contain all required documents. Bidders and all subcontractors must register as vendors in Palm Beach County's Vendor Self Service (VSS) system. All subcontractor agreements must require VSS registration. Bids must be submitted on Palm Beach County forms and include a bid bond of at least 5% of the bid price. The successful bidder will be required to provide a public construction bond (100%) within fourteen calendar days of notification. All professional licenses or certifications required by the State of Florida and/or Palm Beach County must be possessed by bidders and identified subcontractors at the time of bid submission. There is a mandatory minimum 15% Small Business Enterprise (SBE) subcontracting goal for this project. Bids that do not meet this goal may be deemed non-responsive unless a waiver is requested at least seven days prior to the bid due date. Additional SBE forms and details are provided on the county's website. Bidders may obtain bid documents from the county website or designated plan houses, and must inform the County Water Utilities Department Project Manager if documents are obtained from a plan house in order to receive addenda and communications. A nonrefundable fee is required for physical document sets. The Board of County Commissioners reserves the right to waive bid irregularities, informalities, or technical deficiencies and to reject any or all bids. Questions may be addressed in writing to Daisy Zheng , P.E. at dzheng@pbcwater.com or Palm Beach County Water Utilities Department , 8100 Forest Hill Blvd. , West Palm Beach , FL, 33413 . Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which shall reach the Department at the name and address listed in the Invitation to Bid at least ten calendar days prior to the date for receipt of Bids. questions shall be submitted in writing to the Engineer no less than ten (10) calendar days (April 5, 2026, 5:00 PM), All questions during bidding must be submitted in writing (dzheng@pbcwater.com). A pre-construction meeting will be held within 60 to 90 days after execution of the Contract by the Board of County Commissioners.

Bid Results

Water / Sewer

$8,500,000.00

Public - County

New Construction, Site Work

8

54

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
85
Bidding Soon
1,546
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

June 22, 2026

Project location map

Lyons Rd, Boca Raton, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.