BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Sunrise, Florida. Completed plans call for site work for a water / sewer project.

The work to be performed includes demolition of the existing Odor Control Scrubber and associated chemical tanks and appurtenances, and installation of a new Carbon Adsorber system including foul air intake piping modifications. The contractor is required to provide a temporary Odor Control System during construction to ensure uninterrupted odor control operations for the Sludge Holding Tank and Dewatering facility. The scope also includes replacement of six existing mixers with hyperboloid mixers and aerator systems, installation of new mixer Variable Frequency Drives (VFDs), modification of existing access hatches, air piping modifications, replacement of level sensor instruments, and addition of Oxidation Reduction Potential (ORP) sensors at the Sludge Holding Tanks. Replacement of RAS & WAS pump stations valves and piping above and below grade is also required. Additionally, the project involves replacement of two Chlorine Contact Basin slide gates, concrete repair due to cracks, and recoating at basin walls. The contractor must provide a full bypass system to allow flow to continue past the Chlorine Contact Basins to the clarifiers while the CCB is offline for repairs. Other work includes installation of a 16-inch owner-furnished pressure sustaining valve on the effluent transfer pipeline, replacement of two Equalization tank isolation valves, installation of a new 8-inch water main from High Service Pump station A to the Plant Water Pump station pipe header, including a new backflow assembly and fire hydrant, and electrical and instrumentation and controls work related to the scope of work as shown in the drawings. The contractor must have a Florida Certified General Contractors License and/or Florida Certified Building Contractors License and must have worked on three projects of similar size and scope in the past five years. Attendance at a mandatory pre-bid conference and site visit is required. Contractors are responsible for bringing any required subcontractors to these events. The new deadline for questions is as follows: Date: Monday, April 27, 2026 Time: 12:00 Noon Any questions or inquiries regarding the Instructions, Bid Procedures, or the Contract Documents must be directed in writing to the individual listed below. Maria Salvatierra, MBA, CPPO, NIGP-CPP, FCCM Procurement Specialist, City of Sunrise 10770 W. Oakland Park Blvd. Sunrise, Florida 33351 (954) 572-2484 phone (954) 578-4809 fax Msalvatierra@sunrisefl.gov - email

Bid Results

Water / Sewer

$7,607,437.00

Public - City

Site Work

72

18

48

8

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
80
Bidding Soon
1,467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

July 6, 2026

Project location map

4350 Springtree Dr, Sunrise, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.