BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Edmonton, Alberta. Completed plans call for site work for a water / sewer project.

The project will be delivered through the Integrated Project Delivery (IPD) method. The current scope is for the Validation Phase, where the IPD team will collaborate with EPCOR, other IPD partners, trade partners, and suppliers to plan the project, refine and assess EPCOR’s requirements and objectives within the available budget and schedule, assess the project site and identify key risks such as space constraints and approval challenges, develop the design to establish a realistic Base Target Cost, and prepare and deliver the Validation Report. The project team is expected to co-locate at Gold Bar or within Edmonton as agreed by the project team. Project Execution phases (Design/Procurement, Construction, Warranty) will proceed only if validation is accepted and internal approvals are secured, with potential schedule gaps between phases. The intent is to select a suitable IPD team based primarily on qualifications, rate sheet, profit expectation, and collaborative ability, with preference for wastewater or water treatment plant experience. The selected General Contractor and Prime Consultant will enter into the contract. Under the contract, parties are paid costs plus a profit pool contingent on achieving project targets and objectives. Joint, active management and Lean Principles are required to increase efficiency, provide innovation, and reduce waste. The process involves commercial negotiations and does not create a legally binding obligation until successful negotiation and execution of a contract. Proponents are responsible for their own evaluations and submissions. Question Deadline 04/15/2026 at 2:00 PM MT

Post-Bid

Water / Sewer

$15,000,000.00

Public - State/Provincial

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
57
Bidding Soon
617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

June 4, 2026

Project location map

Multiple Locations, Edmonton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.