BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 16, 2026 at 8:00 PM

Updated July 22, 2026

Site work and paving for a bridge / tunnel in Clinton, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The proposed work includes: Hydrodemolition of existing bridge deck and installation of Latex Modified Concrete on entire surface of Urich Road Bridge over Town Creek Bridge 0895003 All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. The City of Clinton reserves the right to reject any or all bids MO DOT - Urich Road Bridge Latex Modified Concrete Rehabilitation

Post-Bid

Bridges / Tunnels

$300,000.00

Public - City

Paving, Site Work

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
26
Bidding Soon
1,029
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2026

August 7, 2026

Project location map

Urich Rd, Clinton, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.