BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a bridge / tunnel in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel.

Bridge Culvert Installation, Demolition and Other Work 11:10, B.F. 9499 - Carrying Hwy 11:10 over Watercourse, 4 km N of Rocky Mountain House, AB kilometre 5.098 to 5.163 CENTRAL REGION APPROXIMATE QUANTITIES: 1 Lump Sum Traffic Accommodation for Bridge Construction 1 Lump Sum Site Isolation and Water Accommodation 1 Lump Sum Demolition and Disposal of Bridge Structure 1 Lump Sum Excavation - Structural 148 Metre CSP with Couplers - Supply (2.2 m Inside Dia.) 30 Metre SWSP - Supply (1.83 m Outside Dia.) 1 Lump Sum Backfill 240 Cubic Metre Heavy Rock Riprap (Class 2) 1 Lump Sum Roadway Work Contractor to supply all materials.

Award

Bridges / Tunnels

$909,862.00

Public - State/Provincial

Site Work

19

12

6

6

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
58
Bidding Soon
620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

June 1, 2026

Project location map

Multiple Locations, Edmonton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.