Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 23, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of a power facility in Houston, Texas. Completed plans call for the renovation of a power facility.
The State of Texas, by and through Texas Southern University (TSU), seeks proposals from qualified contractors to supply all labor, supervision, technical staff, management, and services needed to develop and execute a comprehensive work design and plan to remove and replace two (2) existing Hot Water Boilers and one (1) Steam Boiler (total of 3) located in the Satellite Plant and New Science Center Building at Texas Southern University. The boilers have reached the end of their useful life. Question Deadline 03/23/2026 at 12:00 PM CT Questions must be emailed to Sceffers Ward at sceffers.ward@tsu.edu in Word format for ease of cutting and pasting. HOT WATER BOILER - Quantity 2 Manufacturer: Sellers Boiler Model Number: S-300-W Model 15 Sensor Maximum Design Pressure: 150 psi Input BTU/HR: 12,553,000 Output BTU/HR: 10,043,000 Fuel: Natural Gas Fuel Supply Pressure: 5 psi. Additional Characteristics o One-pass horizontal fire tube boiler o Combustion: Sealed o Steel Tube Heat Exchange o 40 - 800 HP (0.4 - 33.4mmBTU) o Ox Rating: Less than 30ppm o Certifications: ASME "H" stamp, UL o 5-year (burner) | 20-year (shell) STEAM BOILER - 1 Manufacturer: Sellers Boiler Model Number: 125HP Model 105E Maximum Design Pressure: 150 psi Capacity: 4,313 lb. Steam/HR Input BTU/HR: 5,231,000 Output BTU/HR: 4,184,000 Fuel: Natural Gas Fuel Supply Pressure: 5 psi. Work scope listed is not all inclusive: o Disconnect Electrical o Demo Necessary Interconnecting Piping o Demo the existing Flue Vents o Demo the Existing Sellers Boilers o Clean and Prep Area for the New Equipment o Set the (3) New Sellers Boiler in Place o Install the (3) New Flue Vents to Existing Penetration o Install Insulation and Metal Jacketing on New Flue Vents o Install Supply and Return Piping to New Boilers from Header o Insulation to Insulation to New Supply and return Piping o Install Gas Piping to Existing Gas Connections o Install Relief Valve and Drain Piping o Fill System and Check for Leaks o Reconnect Electrical to Boilers o Replace 3-way mixing valve on Hot Water Line o Startup Boiler to Manufacturers Specifications
Post-Bid
Power Plant
$900,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2026
May 4, 2026
Multiple Locations, Houston, TX
Related To This Project
Houston, TX
Bid Date: Apr 17 2026
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Apr 01 2026
Houston, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
