BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a power facility in Houston, Texas. Completed plans call for the renovation of a power facility.

The State of Texas, by and through Texas Southern University (TSU), seeks proposals from qualified contractors to supply all labor, supervision, technical staff, management, and services needed to develop and execute a comprehensive work design and plan to remove and replace two (2) existing Hot Water Boilers and one (1) Steam Boiler (total of 3) located in the Satellite Plant and New Science Center Building at Texas Southern University. The boilers have reached the end of their useful life. Question Deadline 03/23/2026 at 12:00 PM CT Questions must be emailed to Sceffers Ward at sceffers.ward@tsu.edu in Word format for ease of cutting and pasting. HOT WATER BOILER - Quantity 2 Manufacturer: Sellers Boiler Model Number: S-300-W Model 15 Sensor Maximum Design Pressure: 150 psi Input BTU/HR: 12,553,000 Output BTU/HR: 10,043,000 Fuel: Natural Gas Fuel Supply Pressure: 5 psi. Additional Characteristics o One-pass horizontal fire tube boiler o Combustion: Sealed o Steel Tube Heat Exchange o 40 - 800 HP (0.4 - 33.4mmBTU) o Ox Rating: Less than 30ppm o Certifications: ASME "H" stamp, UL o 5-year (burner) | 20-year (shell) STEAM BOILER - 1 Manufacturer: Sellers Boiler Model Number: 125HP Model 105E Maximum Design Pressure: 150 psi Capacity: 4,313 lb. Steam/HR Input BTU/HR: 5,231,000 Output BTU/HR: 4,184,000 Fuel: Natural Gas Fuel Supply Pressure: 5 psi. Work scope listed is not all inclusive: o Disconnect Electrical o Demo Necessary Interconnecting Piping o Demo the existing Flue Vents o Demo the Existing Sellers Boilers o Clean and Prep Area for the New Equipment o Set the (3) New Sellers Boiler in Place o Install the (3) New Flue Vents to Existing Penetration o Install Insulation and Metal Jacketing on New Flue Vents o Install Supply and Return Piping to New Boilers from Header o Insulation to Insulation to New Supply and return Piping o Install Gas Piping to Existing Gas Connections o Install Relief Valve and Drain Piping o Fill System and Check for Leaks o Reconnect Electrical to Boilers o Replace 3-way mixing valve on Hot Water Line o Startup Boiler to Manufacturers Specifications

Post-Bid

Power Plant

$900,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
268
Bidding Soon
3,833
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.