Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2026 at 8:00 PM
Updated March 27, 2026
This is a service / maintenance or supply contract in Huntsville, Utah. Contact the soliciting agency for additional information.
Questions Due Date: Mar 25th 2026, 2:00 PM MDT This is a requirements annual contract with a total possible length of five (5) years that can be terminated at any time within the contract time by either party (UDOT or Contractor). A. Contractor shall provide all labor, materials, mileage, travel, mobilization and equipment costs to provide maintenance and vegetation control at the two identified UDOT Region 1 wetland mitigation sites. (See Appendix A) 1. MS0052 – US-89, Snow Creek mitigation site (Snow Creek) a. Location: 41.077615, -111.910014 b. Site Acreage: Approximately 2.6 acres which includes: i. Upland Habitat = 1.74 acres ii. Wetland Habitat = 0.68 acres iii. Snow Creek channel = 0.13 acres (Approximately 1,700 LF) c. Snow Creek mitigation site is divided into 3 separate locations which equal the combined habitat above. d. Contract Work will occur annually 2. MS0055 – SR-39, Huntsville mitigation site (Huntsville) a. Location: 41.261137, -111.760303 b. Site Acreage: Approximately 3.5 acres which includes: i. Upland Habitat = 2.35 acres ii. Wetland Habitat = 0.97 acres iii. Stream channel = 0.18 acres (approximately 550 LF) c. Contract Work will occur annually
Post-Bid
Municipal
Public - State/Provincial
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2026
April 27, 2026
Multiple Locations, Huntsville, UT
Related To This Project
Huntsville, UT
Bid Date: Feb 24 2026
Huntsville, UT
Bid Date: Nov 18 2025
Huntsville, UT
Bid Date: Sep 16 2025
Huntsville, UT
Bid Date: Sep 25 2025
Huntsville, UT
--
Huntsville, UT
--
Huntsville, UT
Bid Date: Aug 21 2025
Huntsville, UT
Bid Date: Feb 20 2025
Huntsville, UT
Bid Date: Nov 07 2024
Huntsville, UT
Bid Date: Aug 06 2024
Huntsville, UT
Bid Date: Jul 02 2024
Huntsville, UT
Bid Date: May 07 2024
Huntsville, UT
Bid Date: Mar 28 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
