Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 11, 2026 at 8:00 PM
Updated May 20, 2026
Demolition, site work and new construction of a mixed-use development in Mesa, Arizona. Completed plans call for the demolition of a swimming pool; for the construction of a swimming pool; and for site work for a swimming pool.
The City of Mesa is seeking up to two qualified Construction Managers at Risk (CMARs) to provide Pre-Construction Services and complete Construction Services for the Eastmark and Red Mountain Aquatic Complex projects. The projects involve constructing new aquatic complexes at 9603 E Point Twenty-Two Boulevard and at 7550 E Adobe Street, including demolition and construction, competition and/or lap pool and diving well, recreation pool with water slides, pool deck with gutter systems, a building for pool offices with an enclosed bathhouse, mechanical equipment building for pumps and maintenance, ramadas, lighting, bleachers with shade structures for pool events, multi-use turf areas, vehicle parking lots, loading zones, pedestrian areas, sidewalks, and other associated work. The estimated construction cost for each complex is $20,000,000. The CMAR will participate in both Pre-Construction and Construction Services, which may include responsibilities such as project planning and scheduling, constructability reviews, value engineering, cost estimating, procurement, construction phasing, serving as the general contractor, coordinating with utilities, managing site operations, providing quality control, and ensuring bonding and insurance. The Statement of Qualifications shall include a one-page cover letter with current company/firm contact information, and a maximum of ten pages addressing the SOQ evaluation criteria, including an organizational chart with key personnel and their affiliation. Resumes for each team member are limited to two pages and should be attached as an appendix. Minimum font size is 10pt. One electronic copy in unencrypted PDF format must be provided. Questions pertaining to the Construction Manager at Risk selection process or contract issues should be directed to Tracy Gumeringer of the Engineering Department at Tracy.Gumeringer@mesaaz.gov.
Post-Bid
Swimming Pools
$20,000,000.00
Public - City
Demolition, New Construction, Site Work
Documents for this project are exclusively Plans. If Specifications become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2026
December 16, 2026
Multiple Locations, Mesa, AZ
Related To This Project
Mesa, AZ
--
Mesa, AZ
Bid Date: Apr 16 2026
Mesa, AZ
Bid Date: Apr 17 2026
Mesa, AZ
--
Mesa, AZ
Bid Date: Mar 12 2026
Mesa, AZ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
