Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 21, 2026 at 8:00 PM
Updated May 22, 2026
Site work, renovation and addition to a municipal facility in Whitby, Ontario. Working plans call for the renovation of a 30,000-square-foot municipal facility; for the addition of a 8,000-square-foot, one-story above grade municipal facility; and for site work for a municipal facility.
Prequalification of General Contractors for the South Whitby building retrofit, renovation and addition project. The Region of Durham is undertaking a multi-phase project that includes renovating and retrofitting an existing two-storey building (Phase 2) and constructing a new ancillary building on the property (Phase 3). The first priority is Phase 2 which is anticipated to be completed in 2026. Dependant on internal and external approvals, Phase 3 will be tendered as a separate assignment to be priced by the same prequalified bidders in 2027. Overall, the renovation is to create a modernized office space, that supports operational needs, and creates an efficient, safe and healthy work environment. The existing two storey building is located in Southern Whitby, Ontario and is within 3 km of Hwy 401 access. General Contractor to supply all labour, materials, equipment and supervision required to complete demolition, electrical, mechanical, structural and general construction of the identified areas throughout the two stories of the building (20,000 to 30,000 sq. ft). The main objectives of the renovation and retrofit design (Phase 2) include: 1. Providing a variety of program specific accommodation spaces that fulfill operational requirements. These include project rooms, lunchrooms, locker rooms, fitness and shower facilities. 2. Mechanical and electrical modifications including base building power and data connections to furniture and equipment. 3. New back-up generator, including upgraded incoming electrical transformer service, and duct banks connecting new transformer and back-up generator to existing building electrical room. 4. IT panels - wiring. 5. Coordinate installation of all existing and new owner purchased furniture, fixtures and equipment. The purchase of furniture by others. The main objectives of the ancillary building construction (Phase 3) design include: 1. The Construction of a new one storey building, slab-on-grade construction with exterior covered parking canopy, between 5,000 to 8,000 sq. ft. which will accommodate garages, offices and washrooms. 2. Siteworks including parking lot re-striping, localized demolition and new construction of asphalt and curbing. The General Contractor should have experience delivering at least three projects of similar size and scope that have achieved substantial performance within the past seven (7) years. Similar size and scope for this project is as described herein where projects are of approximately $2,000,000 to $5,000,000 in value, specifically including interior renovations and/or additions of office facilities. Documents can be obtained at: https://durham.bidsandtenders.ca Question Deadline: Tue Mar 31, 2026 5:00:00 PM (EDT)
Final Planning
Municipal
$5,000,000.00
Public - County
Addition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2026
June 22, 2026
ON-401, Whitby, ON
Related To This Project
Whitby, ON
Bid Date: Apr 29 2026
Whitby, ON
Bid Date: May 28 2026
Whitby, ON
Bid Date: May 12 2026
Whitby, ON
Bid Date: Jun 05 2026
Whitby, ON
Bid Date: May 26 2026
Whitby, ON
Bid Date: May 20 2026
Whitby, ON
Bid Date: Jun 03 2026
Whitby, ON
Bid Date: Apr 23 2026
Whitby, ON
Bid Date: May 21 2026
Whitby, ON
Bid Date: Apr 07 2026
Whitby, ON
Bid Date: Apr 07 2026
Whitby, ON
Bid Date: Apr 09 2026
Whitby, ON
Bid Date: Mar 09 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
