Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 18, 2026 at 8:00 PM
Updated March 19, 2026
Site work and paving for a mixed-use development in Medley, Florida. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
This project includes roadway improvements along SR 934/NW 74 Street Connector/Hialeah Expressway from west of NW 77 Court to east of SR 823/W 57 Avenue/Red Road. Planned work consists of upgrading curb ramps, barriers, and roadway signing; enhancing pedestrian signalization; repaving and restriping the roadway; and performing utility adjustments. Informational Coverage: This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com.
Design
Roads / Highways
$14,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2027
Hialeah Expy & NW 74th St, Medley, FL
Related To This Project
Medley, FL
--
Medley, FL
Bid Date: Jan 22 2026
Medley, FL
Bid Date: Jan 07 2026
Medley, FL
Bid Date: Nov 19 2025
Medley, FL
Bid Date: Sep 02 2025
Medley, FL
Bid Date: Sep 26 2025
Medley, FL
Bid Date: Aug 26 2025
Medley, FL
Bid Date: Jul 16 2024
Medley, FL
--
Medley, FL
Bid Date: Feb 15 2024
Medley, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
