BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Minneapolis, Minnesota. Completed plans call for site work for a water / sewer project.

As of May 13, 2026 this project has not yet been awarded. A timeline for award has not yet been established. Provide all materials, labor, equipment and incidentals necessary for 3rd St N Sanitary Sewer Reconstruction Project for Public Works-Sanitary Sewer, in accordance with the provided specifications, event line items and all requested documents. The work includes construction, sewer and water construction, sanitary sewer (gravity), concrete pavement, traffic control, pavement removal, street, road, highway median construction or repair, utility street construction and excavation. Bidders are instructed to refer to the bid specifications and documents and are encouraged to join the non-mandatory virtual pre-bid meeting. Electronic bids are to be submitted as specified. Questions due by: 12:00 PM on 04/01/2026 For additional information or questions, contact the buyer. All questions must be submitted in writing. Kimberly K Wilson kimberly.wilson@minneapolismn.gov Small and Underutilized Business Program (SUBP) Goals 3% Combined MBE / WBE Employment Goals 20% Female and 32% Minority

Bid Results

Water / Sewer

$1,193,666.00

Public - City

Site Work

42

6

23

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
163
Bidding Soon
1,417
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

July 6, 2026

Project location map

N 3rd St, Minneapolis, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.