BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 13, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in Saint Augusta, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The scope of work includes 10,530 linear feet of curb and gutter removal, 5,384 square yards of bituminous removal, 35,860 square feet of concrete removal, 19,680 square yards of full-depth bituminous pavement reclamation, 9,152 cubic yards of common excavation, 6,090 cubic yards of aggregate base, 5,648 tons of bituminous paving, 1,374 square yards of 6-inch concrete pavement, 277 square yards of 8-inch concrete pavement, 32,570 square feet of 4-inch concrete walk, 16,555 square feet of 6-inch concrete walk, 765 square feet of block retaining wall, 10,160 linear feet of B618 concrete curb and gutter, lump sum items for traffic control and demolition of a wading pool site, 2,189 cubic yards of screened common topsoil borrow, 80 linear feet of 8-inch DIP sanitary sewer pipe, 4,020 linear feet of 8-inch PVC sanitary sewer pipe, 3,382 linear feet of 6-inch PVC sanitary sewer service pipe, construction of 10 sanitary manholes, 4,655 linear feet of watermain removal, 3,935 linear feet of 8-inch DIP watermain installation, 676 linear feet of 18-inch DIP watermain, installation of 16 hydrants, 3,170 linear feet of 1-inch Type K copper pipe, 3,083 linear feet of 12-24 inch RCP storm drain pipe, 55 storm drain structures, 7 lump sum infiltration systems, and 3 lump sum dewatering, together with appurtenant work. roject Location : 29th and 28th Avenue North from 10th to 12th Street North ; 27th and 26th Avenue North from 11th Street North to 12th Street North ; 10th Street North from 29th Avenue North to 27th Avenue North ; 11th Street North from 29th Avenue North to 27th Avenue North ; and alleyways between 29th and 27th Avenue North from 10th Street North to 12th Street North ; and alleyways from 29th Avenue North to 25th Avenue North between 11th Street North to 12th Street North ; and 29th Ave turf area from 9th Street North to 10th Street North ; and Wading Pool Area just northly of 9th Street North at Madison Elementary School .

Award

Roads / Highways

$4,147,305.00

Public - City

Paving, Site Work

131

18

4

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
174
Bidding Soon
1,959
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 1, 2026

Project location map

Multiple Locations, Saint Augusta, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.