Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 28, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a water / sewer project in West Allis, Wisconsin. Completed plans call for site work for a water / sewer project.
As of April 28, 2026 project was awarded to Mid City Corporation., awarded amount is $1,433,812.50. The work under this Contract will include private lead service line replacements at locations where the City of West Allis has previously replaced the portion of the water service located under the street. The scope involves lead abatement, water utilities, plumbing, trenchless utility construction, waterlines, removal and replacement of pipe, directional drilling, concrete formed flatwork foundation, concrete repair, sawcutting sidewalk pavement, sewer and water construction, traffic control, water wastewater infrastructure, electrical, televising sewers, and work at water and wastewater facilities. Pre-qualification: Required and consisting of the following approximate quantities: 1. Pre-Construction Site Investigation.................................................................. 225 Each 2. 1" Dia. Private Water Service (225) ................................................................. 6,750 Lin. Ft. 3. Reconnection to Interior Water Distribution Piping............................................ 225 Units 4. Additional Interior Water Plumbing................................................................. 1,125 Lin. Ft. 5. Video Inspection of Sanitary Sewer Lateral (225) ............................................... 450 Each 6. 5" Concrete Sidewalk & Driveway ................................................................11,250 Sq. Ft. All questions about the meaning or intent of the contract documents are to be directed to the City Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by addenda mailed or delivered to all parties recorded by the Engineer as having received proposal forms. Questions received less than ten (10) days prior to the date for opening of bids may not be answered. Only questions answered by formal written addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
Award
Water / Sewer
$1,433,813.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2026
May 1, 2026
Multiple Locations, West Allis, WI
Related To This Project
West Allis, WI
Bid Date: Apr 22 2026
West Allis, WI
Bid Date: Apr 08 2026
West Allis, WI
Bid Date: Apr 08 2026
West Allis, WI
Bid Date: Jun 04 2026
West Allis, WI
Bid Date: May 12 2026
West Allis, WI
Bid Date: Apr 30 2026
West Allis, WI
Bid Date: May 15 2026
West Allis, WI
Bid Date: Apr 30 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
