Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 4, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a sidewalk / parking lot in New York, New York. Completed plans call for site work for a sidewalk / parking lot.
Summary of Work: Remove Perimeter Concrete - Supply - Install New Perimeter Concrete Walkway Work is to be completed within 14 days of award SCOPE OF WORK Includes, but is not necessarily limited to the following: 1 Contractor shall verify the actual measurements and condition of work to be done to ensure a complete and accurate job. Contractor to supply all labor, material, permits and equipment to complete work. 2 The work area must be kept in a neat orderly fashion during concrete Demolition stage of work to keep home free of any dust and debris and safe for all pedestrians and individuals. 3 Remove existing Concrete and soil on exterior walkway and replace with new 6000 PSI concrete. 4 Remove existing Concrete and soil on interior side walkway and replace with 6000 PSI concrete. 5 Contractor is to properly compact base for new walkways with a minimum of 4 inches of crushed gravel and sand and wire mesh for a up to NYS code standard job. 6 Contractor to ensure new concrete flags are properly pitched for water drainage away from the home. 7 Contractor to install expansion joints and scores accordingly AS PER NYS BUILDING CODE. 8 Each expansion joint shall be caulked using trade standard concrete caulking with poly sealer. 9 Surface of new concrete to be left in a broom swept condition. 10 Contractor is responsible for contacting all agencies for mark outs of utilities before start of work. 11 All debris must be removed and disposed of daily, nothing at the end of the day to be left on the property. 12 All work must meet or exceed trade standard vendor to ensure the proper mix will be used. 13 If any cracks, gaps or pitch does not come out correct all newly poured concrete will need to be taken out and redone. 14 Contractor is to supply a Three-year warranty on all work. All debris must be removed daily. Winning bidders quote shall be valid for 60 days from day winning bid has been received. All work must not interfere with day-to-day operation. Contractor to provide 1 million in insurance liability coverage. Certified Minority or Women-Owned Business Enterprises (MWBEs) should periodically review their business information in the state's MWBE Directory to ensure that all contact and product information is up to date. Prime contract holders use the directory to identify potential suppliers and subcontractors for fulfilling MWBE utilization goals. Question Deadline 04/09/2026 Must be submitted in writing to: Brooklyn.CMM.Bids@opwdd.ny.gov Concrete Walkway. The Vendor to supply and install all Materials and Labor to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 14 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of new concrete walkway, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.
Post-Bid
Sidewalks / Parking Lot
$50,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2026
June 1, 2026
95-06 120th St, New York, NY
Related To This Project
New York, NY
Bid Date: Apr 24 2026
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Apr 28 2026
New York, NY
Bid Date: Apr 20 2026
New York, NY
--
New York, NY
Bid Date: Apr 06 2026
New York, NY
--
New York, NY
Bid Date: Mar 27 2026
New York, NY
--
New York, NY
--
New York, NY
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
