BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a sidewalk / parking lot in New York, New York. Completed plans call for site work for a sidewalk / parking lot.

Summary of Work: Remove Perimeter Concrete - Supply - Install New Perimeter Concrete Walkway Work is to be completed within 14 days of award SCOPE OF WORK Includes, but is not necessarily limited to the following: 1 Contractor shall verify the actual measurements and condition of work to be done to ensure a complete and accurate job. Contractor to supply all labor, material, permits and equipment to complete work. 2 The work area must be kept in a neat orderly fashion during concrete Demolition stage of work to keep home free of any dust and debris and safe for all pedestrians and individuals. 3 Remove existing Concrete and soil on exterior walkway and replace with new 6000 PSI concrete. 4 Remove existing Concrete and soil on interior side walkway and replace with 6000 PSI concrete. 5 Contractor is to properly compact base for new walkways with a minimum of 4 inches of crushed gravel and sand and wire mesh for a up to NYS code standard job. 6 Contractor to ensure new concrete flags are properly pitched for water drainage away from the home. 7 Contractor to install expansion joints and scores accordingly AS PER NYS BUILDING CODE. 8 Each expansion joint shall be caulked using trade standard concrete caulking with poly sealer. 9 Surface of new concrete to be left in a broom swept condition. 10 Contractor is responsible for contacting all agencies for mark outs of utilities before start of work. 11 All debris must be removed and disposed of daily, nothing at the end of the day to be left on the property. 12 All work must meet or exceed trade standard vendor to ensure the proper mix will be used. 13 If any cracks, gaps or pitch does not come out correct all newly poured concrete will need to be taken out and redone. 14 Contractor is to supply a Three-year warranty on all work. All debris must be removed daily. Winning bidders quote shall be valid for 60 days from day winning bid has been received. All work must not interfere with day-to-day operation. Contractor to provide 1 million in insurance liability coverage. Certified Minority or Women-Owned Business Enterprises (MWBEs) should periodically review their business information in the state's MWBE Directory to ensure that all contact and product information is up to date. Prime contract holders use the directory to identify potential suppliers and subcontractors for fulfilling MWBE utilization goals. Question Deadline 04/09/2026 Must be submitted in writing to: Brooklyn.CMM.Bids@opwdd.ny.gov Concrete Walkway. The Vendor to supply and install all Materials and Labor to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 14 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of new concrete walkway, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.

Post-Bid

Sidewalks / Parking Lot

$50,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,248
Active Projects
694
Bidding Soon
8,374
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2026

June 1, 2026

Project location map

95-06 120th St, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.