Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a detention facility in Ottawa, Ontario. Completed plans call for the construction of a detention facility; detention facility; 7,000-square-foot detention facility; and 21,375-square-foot detention facility.
Colliers Project Leaders Inc. is seeking to procure a highly experienced Construction Manager to complete the delivery of a high-priority Government project at the Central North Correctional Center (CNCC). The project involves the design and construction of a 21,375 sqft Tensile Membrane Structure, a 7,000 sqft exterior covered yard area, and a 10' x 300' link tunnel connection from the existing jail to the new structure. Additional minor interior upgrades will be made to ancillary spaces such as the lobby, kitchen, dry goods storage, and admit/discharge area to accommodate increased capacity. The design and construction phases will overlap and require the Construction Manager to work in parallel with the Prime Consultant to deliver the project through multiple coordinated construction packages. Bidders are required to attend the mandatory Online Teleconference on Microsoft Teams and register their name, title, and company name with the representative; failure to attend and register will result in the proposal not being accepted. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 03/25/2026 at 5:00 PM ET Pre-Bid Meeting: This online teleconference will begin on 1:00pm EST March 24, 2026 on Microsoft Teams. Bidders can join using the following link and details below: https://teams.microsoft.com/meet/23199093527197?p=Ob8jlGwJpczXCa6fOJ Meeting ID: 231 990 935 271 97 Passcode: N2PT26yo To dial in by phone, +1 437-703-4461,,930914478# Canada, Toronto Phone conference ID: 930 914 478# Bidders shall attend the mandatory Online Teleconference on Microsoft Teams and ensure they register their name, title and company name with Colliers' representative. Failure to attend and to register will result in the Bidder’s Proposal not being accepted. We ask that you arrive a minimum of 10 minutes prior to the start of the meeting; we will not be able to accommodate if you arrive late.
Award
Jails / Prisons
$1,042,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
14
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2026
April 13, 2026
2720 Iris St, Ottawa, ON
Related To This Project
Ottawa, ON
Bid Date: May 04 2026
Ottawa, ON
Bid Date: Apr 22 2026
Ottawa, ON
Bid Date: May 14 2026
Ottawa, ON
--
Ottawa, ON
Bid Date: May 07 2026
Ottawa, ON
Bid Date: Jun 05 2026
Ottawa, ON
Bid Date: Mar 31 2029
Ottawa, ON
Bid Date: Apr 07 2026
Ottawa, ON
--
Ottawa, ON
--
Ottawa, ON
Bid Date: May 14 2026
Ottawa, ON
Bid Date: Apr 02 2026
Ottawa, ON
--
Ottawa, ON
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
