BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 20, 2026 at 8:00 PM

Updated August 5, 2026

Demolition, site work, paving, remodeling and renovation of a mixed-use development in Palmdale, California. Completed plans call for the remodel of a library; for the renovation of a library; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; for the demolition of a library; and library.

This project consists of the complete renovation and modernization of the existing Chimbole Center and selective renovations to the adjacent Library in the City of Palmdale. The scope includes selective demolition, structural steel framing, foundations, roofing systems, exterior windows and doors, new two-level glass concourse, architectural panel systems, and extensive interior renovations. The library will receive a new main entrance through the renovated Chimbole Center, In addition to the architectural improvements, the project includes all-new mechanical, plumbing, electrical, fire alarm, and fire sprinkler systems, along with audio-visual, communications, security, and access control systems. Significant site and infrastructure work is also included, featuring parking lot improvements, EV charging stations, landscaping, irrigation, storm drainage facilities, and off-site roadway improvements. The project presents bid opportunities across approximately 44 trade packages spanning structural, architectural, MEP, low-voltage, site, and specialty scopes, and will be delivered under a Community Workforce Agreement with prevailing wage requirements. Project Duration: 17 Months (504 Calendar Days) Liquidated Damages: $5,000/Day Prevailing Wage Project Compliance with the CWA is required. PRE-BID RFIs: Last day to submit RFIs is 7/1/26 at 10 AM All subcontractors, including DVBE subcontractors, shall be prepared to provide payment and performance bonds equal to 100% of their subcontract value. ProWest will pay bond premiums up to 1.5%. Please provide your bond rate with your proposal. ProWest reserves the right to require Financial Statements for evaluation and consideration when awarding work to any Subcontractor.

Post-Bid

Library

$25,000,000.00

Public - City

Demolition, Paving, Remodeling, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
637
Active Projects
270
Bidding Soon
4,104
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2026

September 21, 2026

Project location map

38350 Sierra Hwy, Palmdale, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.