BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Wheaton, Illinois. Completed plans call for site work for a water / sewer project.

DuPage County Public Works is seeking bids for the rehabilitation and upgrade of two elevated water storage tanks. The awarded bidder shall provide all labor, services, and materials needed to complete the work described in the specifications. Question Deadline 03/31/2026 at 4:00 PM CT Questions due to Buyer via email: henry.kocker@dupagecounty.gov start date of 5/1/2026 and a completion date of 11/30/2026. 22-R0593 TO2 DuPage County Public Works is rehabilitating an existing 250,000-gallon elevated Spheroid Water Tank. Due to the existing coating reaching the end of its design life, the structure requires extensive coating failure and corrosion remediation and system upgrades. o Exterior Restoration: Full containment and SSPC-SP6 Commercial Blast Cleaning, finished with a high-performance three-coat system. o Interior Wet/Dry Maintenance: SSPC-SP10 Near-White Blasting for the wet interior and SSPCSP6 for dry areas, both receiving a two-coat protective system. o Pump House Piping: SSPC-SP6 Commercial blast cleaning, finished with a two-coat zinc, epoxy system. o Foundation Surface: Pressure wash clean foundation, finished with a two-coat epoxy system. o Mechanical & Safety Upgrades: Weld-seal access tube vent. o Compliance & Access: New aviation lighting, an overflow flap gate screen. A. Project Overview: 1) Under full containment abrasive blast, the exterior to a commercial blast clean (SSPC-SP6) standard, followed by a three (3) coat zinc, high-performance acrylic urethane, fluoropolymer coating system 2) Abrasive blast the interior dry area to a commercial blast clean (SSPC-SP6) standard. Followed by a two (2) coat zinc primer, epoxy topcoat coating system. 3) Abrasive blast the interior wet to near white finish (SSPC-SP10) standard. Followed by a two (2) coat zinc primer, high-solids epoxy topcoat coating system. 4) Install new overflow flap gate screen. 5) Weld seal the access tube vent. 6) Install new aviation lights (in kind).

Bid Results

Water / Sewer

$646,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
577
Active Projects
275
Bidding Soon
3,272
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2026

May 1, 2026

Project location map

Multiple Locations, Wheaton, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.