Published May 7, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a water / sewer project in Wheaton, Illinois. Completed plans call for site work for a water / sewer project.
DuPage County Public Works is seeking bids for the rehabilitation and upgrade of two elevated water storage tanks. The awarded bidder shall provide all labor, services, and materials needed to complete the work described in the specifications. Question Deadline 03/31/2026 at 4:00 PM CT Questions due to Buyer via email: henry.kocker@dupagecounty.gov start date of 5/1/2026 and a completion date of 11/30/2026. 22-R0593 TO2 DuPage County Public Works is rehabilitating an existing 250,000-gallon elevated Spheroid Water Tank. Due to the existing coating reaching the end of its design life, the structure requires extensive coating failure and corrosion remediation and system upgrades. o Exterior Restoration: Full containment and SSPC-SP6 Commercial Blast Cleaning, finished with a high-performance three-coat system. o Interior Wet/Dry Maintenance: SSPC-SP10 Near-White Blasting for the wet interior and SSPCSP6 for dry areas, both receiving a two-coat protective system. o Pump House Piping: SSPC-SP6 Commercial blast cleaning, finished with a two-coat zinc, epoxy system. o Foundation Surface: Pressure wash clean foundation, finished with a two-coat epoxy system. o Mechanical & Safety Upgrades: Weld-seal access tube vent. o Compliance & Access: New aviation lighting, an overflow flap gate screen. A. Project Overview: 1) Under full containment abrasive blast, the exterior to a commercial blast clean (SSPC-SP6) standard, followed by a three (3) coat zinc, high-performance acrylic urethane, fluoropolymer coating system 2) Abrasive blast the interior dry area to a commercial blast clean (SSPC-SP6) standard. Followed by a two (2) coat zinc primer, epoxy topcoat coating system. 3) Abrasive blast the interior wet to near white finish (SSPC-SP10) standard. Followed by a two (2) coat zinc primer, high-solids epoxy topcoat coating system. 4) Install new overflow flap gate screen. 5) Weld seal the access tube vent. 6) Install new aviation lights (in kind).
Bid Results
Water / Sewer
$646,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
May 1, 2026
Multiple Locations, Wheaton, IL
Related To This Project
Wheaton, IL
Bid Date: Apr 24 2026
Wheaton, IL
Bid Date: Mar 26 2026
Wheaton, IL
Bid Date: May 06 2026
Wheaton, IL
Bid Date: Apr 22 2026
Wheaton, IL
Bid Date: May 14 2026
Wheaton, IL
Bid Date: May 21 2026
Wheaton, IL
Bid Date: May 21 2026
Wheaton, IL
Bid Date: May 14 2026
Wheaton, IL
--
Wheaton, IL
Bid Date: Apr 09 2026
Wheaton, IL
Bid Date: Mar 31 2026
Wheaton, IL
Bid Date: Mar 26 2026
Wheaton, IL
Bid Date: Mar 26 2026
Wheaton, IL
Bid Date: Mar 26 2026
Wheaton, IL
Bid Date: Mar 25 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.