Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 18, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a mixed-use development in Columbus, Ohio. Completed plans call for site work for a road / highway; road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
This project involves resurfacing and adding on-street, separated bike lanes and a concrete median on Martin Luther King Jr. Boulevard and Mt. Vernon Avenue between Hamilton Avenue and Champion Avenue. Limited repair and replacement of the following will occur throughout the project limits: full-depth pavement, sidewalk, curb, curb ramps, and drive approaches. A traffic signal will be removed at Mt. Vernon Avenue and 17th Street and an existing traffic signal will be replaced at Mt. Vernon Avenue and 20th Street. Other improvements include storm sewer installation, water main and hydrant adjustments, electric distribution line relocation, minor lighting improvements, signing and striping installation, street tree installation, and other such work as may be necessary to complete the contract, as set forth in this Invitation For Bid (IFB). This is a roadway multimodal infrastructure project on Mt Vernon Avenue Phase 1. Requires 10% bid bond, 100% performance bond, prevailing wage compliance, and contract compliance certification. May require DBE participation at 7% goal. Only pre-qualified prime contractors are eligible to submit bids for this project. ODOT Pre-qualification status must be in force at the time of bid, at the time of award, and through the life of the construction contract. The "prime" contractor must perform no less than 50 percent of the total original price. Question Deadline 04/02/2026 The last day to submit questions; phone calls will not be accepted. Responses will be posted online as an addendum. Notice of published addenda will be posted online and all addenda will be posted online. All questions concerning this project are to be sent to capitalprojects@columbus.gov. Roadway improvements to the Martin Luther King Jr/Mount Vernon Avenue corridor from Hamilton Avenue to North Champion Avenue. Improvements include adding an on-street separated bike path with an added concrete median, floating bus islands at various locations, pavement planing and resurfacing the full width of the roadway, and sidewalk repairs.
Bid Results
Roads / Highways
$6,399,036.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
