BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 27, 2026 at 8:00 PM

Updated March 31, 2026

Site work for a playground / park / athletic field in Littleton, Colorado. Completed plans call for site work for a playground / park / athletic field.

Community Parks Landscape Installation Project - Landscaping/Irrigation Install new landscaping in Community Park, including all materials and labor necessary for completion of the work. Bids shall be made on the forms furnished by the Owner and enclosed in a sealed envelope endorsed with the name of the Bidder. A Bid Bond equal to ten percent of the total Bid amount is required. Bidders must supply a list of Subcontractors providing $10,000 or more in labor and/or materials. The Successful Bidder will be required to furnish a Performance Bond and a Labor and Materials Payment Bond in the full amount of the Contract Price. The Owner reserves the right to reject any or all Bids, to waive any informality or irregularity, to disregard non-conforming Bids, to negotiate contract terms with the Successful Bidder, and to require evidence of Bidders' qualifications. Bidders are required to keep their Bids open for sixty days from the date of bid opening. Question Deadline 03/30/2026 Any questions concerning this bid shall be directed in writing to: Peggy Ripko at pripko@sdmsi.com The overall work is to include: a. Demolish the existing gazebo b. Install a new 20' x 20' pavilion with ADA access c. Install an overlook west of the playground ramp d. Install landscaped areas in and around existing trees, the new pavilion, and the overlook e. Landscape plants should primarily utilize native species with credits given for plants sourced from the district's greenhouse f. Include picnic tables and benches g. Siloam stone, or similar stone, shall be used for accent boulders and retaining walls h. Walking areas should use breeze or crusher fines i. Landscape rock must not be light enough that a child can easily pick it up or roll it j. Pea gravel can be used for mulch k. Relocate the existing breaker panel immediately adjacent to the meter by the parking lot entrance

Post-Bid

Playgrounds / Parks / Athletic Fields

$2,000,000.00

Public - County

Site Work

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
126
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2026

May 29, 2026

Project location map

7671 N Rampart Range Rd, Littleton, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.