BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Fresno, California. Completed plans call for the renovation of a educational facility.

Roosevelt High School West Hall HVAC and Chiller Replacement, to replace 58 unit ventilators, three fan coils, and five pumps; remove three chillers and replace with two; install new controls into the existing FX-90 and integrate exterior lighting and all installed equipment; and replace underground hydronic lines. DISTRICT hereby notifies all bidders that they will affirmatively ensure that in any Contract entered into pursuant to this advertisement, disabled veteran business enterprises (DVBE) will be afforded full opportunity to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, creed, sex or national origin in consideration for award. The DVBE goal for the project is as follows: three percent (3%) of the dollar amount of the Contract. Prime Contractor must have a valid Class “C-20” Contractor’s License. The time allowed for completion for the project shall be 235 calendars days. UVs to be installed, site trenching infrastructure and cooling to be operational by August 4, 2026. Central plant and controls to be completed by February 5, 2027. The Architect/Engineers’ estimate for this project is around $2,900,000 (estimate as of September 2025). Bids shall be accompanied by a certified check, cashier’s check, or a bidder’s bond in an amount not less than ten percent (10%) of total bids made payable to Fresno Unified. Question Deadline 04/07/2026 at 5:00 PM PT Please use the Clarification tab to submit Bid questions. Otherwise please call 559-457-6042 for Technical Support. This Project is estimated to be over $1,000,000 and is subject to prequalification, in accordance with Public Contract Code 20111.6. Prequalification applications are to be submitted through Quality Bidders at online no later than 11:59 PM, April 6, 2026. The District reserves the right to accept or reject any or all bids, or any combination of bids and to waive any irregularities or informalities which may be legally waived. All work pertaining to the unit ventilators, fan coils, and controls are to be completed by the end of the new contract date 11/25/2026.

Bid Results

Educational

$3,619,000.00

Public - City

Renovation

63

20

159

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
51
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

June 29, 2026

Project location map

4250 E Tulare Ave, Fresno, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.