Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a data center facility in Norfolk, Virginia. Working plans call for the renovation of a data center facility.

Project has been Cancelled The last date for receipt of questions has been extended. The new date is close of business, Friday, April 3, 2026. Questions must be submitted in writing via email to Donald Shea atdshea@hrtransit.org. No DBE goal has been established for this solicitation Purpose Hampton Roads Transit (HRT) is seeking a qualified Contractor to complete the turn-key upgrade and replacement of six (6) Schnider Electric Uniflair Chilled Water In-Row Cooling Towers deployed at HRT's Southside Facility data center, due to the existing units reaching the end of their useful life and no longer supported by Schnider Electric USA, Inc. as of 2026. 3. Existing Environment A. Service Location HRT's Southside Facility is located at 509 East 18th Street, Norfolk, VA 23504. B. Existing Equipment i. Brand: Schneider Electric ii. Range: Uniflair Chilled Water In-Row Cooling iii. SKU (reference) and complementary identification: ACRC100 iv. Product Description: In-Row RC, 300mm, Chilled Water, 100-120V, 50/60 Hz v. Unit Serial Numbers: a. UK1146110552 b. JK1204010025 c. UK1146110560d. UK1146110559 e. JK1147000441 f. JK1150002746 vi. Phase Type: 1:1 C. Installed Product Lifecycle i. Manufacturing date: 12/10/2011 ii. Commissioning date: 08/13/2012 iii. End of commercialization date: 2016 iv. Obsolescence date: 2026 v. Withdrawal date: 2024 Scope of Services The Contractor shall provide a complete "turnkey" replacement of the existing Uniflair chilled water in-row cooling ACRC100 units with their Schnider Electric direct replacement counterparts as manufactured by the original equipment manufacturer, or approved equal, at the time of the award. The Contractor shall act as the hardware, software, and services reseller, as well as the installer. The data center supported by the ACRC100 units will remain in operation during installation. An extensive amount of care shall be exercised by the Contractor to not affect HRT's operations as part of this effort. All work shall be performed during normal service hours

Final Planning

Data Centers

$1,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
110
Bidding Soon
1,567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed