Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Site work for a transportation facility in Carrington, North Dakota. Completed plans call for site work for a transportation facility.

** As of June 03, 2026. Project has not yet been awarded and the timeline for award has not yet been established ** Sealed bids are requested for the "Airfield Lighting System Improvements" project # EC25-00-018 in Carrington, North Dakota. Bids must be submitted on the basis of a cash payment for the work. Each bid should be enclosed in a sealed envelope addressed to the Airport Authority and designated that the bid is for "Airfield Lighting System Improvements". A Bidder's Bond in the amount of five percent (5%) of the full bid must accompany each bid in a separate envelope, executed by the Bidder and a Surety Company authorized to do business in North Dakota. If awarded, the principal must execute a contract in accordance with the bid and OWNER requirements within ten days after the Notice of Award. AIP No. 3-38-0076-019-2026 AIG No. 3-38-0076-020-2026 The project will consist of: Lighting System Upgrades: - Replace all existing Medium Intensity Runway Lights (MIRL) and cans. - Replace all existing Runway End Threshold Lights and cans. - Replace all existing Medium Intensity Taxiway Lights (MITL) and cans. - Install new electrical wiring in conduit. - Replace radio control unit and associated antenna. - Replace existing contactors, photocell and timer. - New control cabinet to include all associated control items. Beacon: - Replace and relocate the current rotating beacon on a tilt down style pole. - Replace photo eye. Vault: - Replace electrical controls in existing lighting control building (vault). - Replace regulator to support the new LED lighting system. Signage and Navigational Aids: - Replace all Airport Guidance Signs to meet current FAA standards. - Replace PAPIs on Runway 13/31 to meet higher TCH per FAA guidance. - Replace the primary wind cone on tilt down style pole.

Award

Transportation Terminals

$782,260.00

Public - City

Site Work

35

9

11

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
9
Bidding Soon
138
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

May 18, 2026

Project location map

Multiple Locations, Carrington, ND


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed