BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a transportation facility in San Francisco, California. Completed plans call for site work for a 516,644-square-foot transportation facility; 631,022-square-foot transportation facility; and seven-story above grade transportation facility.

The goal is to expand Terminal 3 by approximately 631,022 gross square feet and renovate approximately 516,644 gross square feet of the existing facility while keeping the terminal operational, requiring extensive phasing. This includes upgrading building systems, seismic retrofit, improving passenger flow, enhancing passenger experience, and providing new gates. The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, including secure passenger corridors, baggage handling systems, office space, assembly areas, employee amenity space, CBP One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades. Level 1 of C4C is open to the airfield and apron program; levels 2 and 3 connect to Terminal 3. Trade Package C31: C4C Site Work, Paving and Striping. This includes all demolition, paving, and striping required to support the C4C building program, including early enabling and permanent asphalt concrete pavement installation. CMD LBE Participation Requirement: 25%. Requirements or prequalification criteria may be obtained by contacting the designated representative.

Post-Bid

Transportation Terminals

$344,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
480
Active Projects
252
Bidding Soon
3,559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

August 31, 2026

Project location map

To be determined, San Francisco, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.