BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2026 at 8:00 PM

Updated March 25, 2026

Site work and paving for a mixed-use development in Winter Haven, Florida. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Enhancements will be designed along West Central Avenue to improve safety, accessibility, and neighborhood connections. During design, reconstruction of the sidewalk on the south side from North Lake Howard Drive to 7th Street SW will be considered, with a minimum six-foot width to meet ADA standards, improve driveway and street crossings, and enhance connections to nearby bus stops. Decorative lighting infrastructure along the corridor will also be evaluated to provide a safer, more inviting environment for walking and biking. At the intersection with North Lake Howard Drive, design will explore safety measures such as adjusting the markings, adding signage, and potentially converting the intersection to a three-way stop. At the US 17 crossing, the City will work with FDOT to consider improvements consistent with the US 17 Corridor Vision and Action Plan. Possible treatments may include enhanced crosswalks, curb ramps, safety islands, curb extensions, bike facilities, or actuated signals to create safer east-west connections between Lake Howard, surrounding neighborhoods, and downtown Winter Haven. These potential enhancements reflect Complete Streets principles, with the goal of improving safety, accessibility, and mobility choices while strengthening community connections. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of March 24,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$371,368.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
0
Bidding Soon
1,515
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2031

Project location map

W Central Ave, Winter Haven, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.