Published March 26, 2026 at 8:00 PM
Updated April 4, 2026
Renovation of a multi-residential development in Rock Island, Illinois. Completed plans call for the renovation of a multi-residential development.
Invitation to bid IHDA project for plumbing, carpentry, and electrical repairs located at 930 17th Street, Rock Island. Exterior: Install a new flue liner from the chimney on the roof down to the basement. Then Install a new metal weather cap with a screen around the sides to the clay flue. Once this is completed repair the top of the chimney cap with new mortar. This cap should be pitched away from the flue to keep water from sitting. Tuck Point the bricks on the chimney with matching mortar. Remove the window in the existing bath tub. Frame in the opening. Sheath to blend into the existing sheathing. Install a water barrier over the sheathing. Install matching the surrounding Stucco, blending to the existing surfaces. Electrical: Install smoker/ CO2 detectors on every floor 3 minimum. The basement should be near the gas fired appliances. Install 2 new front entry LED wall light on a motion sensor at the front door. Install a light on the back entry and a switch on the inside of the door. This light should be a LED flood style with a motion sensor. Install a new LED light in the living room replacing the one hanging by its wires. Install a new LED light in the front entry way on the inside of the ceiling. Appears to of had a box installed and Romex ran to the box currently. Install a LED light in the kitchen replacing the old florescent. Install exhaust fan light combo in the bathroom to come on with a switch. This fan will have to be ran through the attic and terminate on the roof. Plumbing: Remove the existing tub. Insulate the wall R-19 and install moisture barrier. Install a new ADA 5' shower with a delta single handle controlling the shower head. Install backing for 2 stainless steel grab bars on the shower wall. Locate one grab bar on the side and one bar on the back wall. Shower base shall be set in a slush of mortar, plaster, or thin-set. Level and plumb the unit using shims as needed. Replumb shower with new supply and waste lines to code. There may be some ceiling patch work in the kitchen to hook up the new shower drain. The closet is open on the back side of the exist tub to access the supply lines. Remove kitchen sink and cabinet. Install a new sink base, countertop, stainless steel sink and Delta single facet with a hose sprayer. Install new supply lines with shut offs and waste lines to code. Remove existing galvanized supply lines in the basement replace all that is accessible to code. After the completion filters and lines will need to be flushed. Remove the basement hot and cold supply lines from the meter to fixtures on the first floor. The boiler system supply line to the unit shall be left as is. The lines that leave and return water to the boiler system shall be left alone. Install a antifreeze silcock with a shut off near the exterior wall. Carpentry: Support the top half of the basement stairs. Remove the landing and the lower set of stairs. Install pier pads to accept posts to support the new land and the stair well head. Concrete pier will need to be 16"x16"x12" each. Concrete has to be a minimum of 5000 lb. mix. Frame a new landing in the original foot print. This landing will support the stairs left in place and support the new set of stairs installed on the lower section. Cut the stair stringers out of 2x12 with 3 stringers. Leave one side of the stringers open with a new support column installed holding 1st floor. Attach a handrail and fall protection on that side. Treads must be full depth and wood risers. Support posts must be attached to new footers with metal tie down bracket and metal tie down straps to the framing members. Use a sanded 3/4 " plywood for the finished product. When completed coat with high traffic primer and high traffic acrylic. Insulated the box sills with R-19 cutting insulation to fit tight to joist pockets. Building, Plumbing, and Electrical permit are required before work begins. All questions shall be directed to the Construction Officer at 309-732-2906.
Post-Bid
Multi-Residential
$800,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2026
May 4, 2026
930 17th St, Rock Island, IL
Related To This Project
Rock Island, IL
Bid Date: Mar 26 2026
Rock Island, IL
Bid Date: Mar 10 2026
Rock Island, IL
Bid Date: Mar 11 2026
Rock Island, IL
Bid Date: Mar 05 2026
Rock Island, IL
Bid Date: Feb 25 2026
Rock Island, IL
Bid Date: Mar 25 2026
Rock Island, IL
Bid Date: Feb 09 2026
Rock Island, IL
Bid Date: Feb 13 2026
Rock Island, IL
Bid Date: Feb 06 2026
Rock Island, IL
Bid Date: Jan 23 2026
Rock Island, IL
Bid Date: Mar 06 2026
Rock Island, IL
Bid Date: Jan 29 2026
Rock Island, IL
Bid Date: Feb 20 2026
Rock Island, IL
Bid Date: Mar 31 2026
Rock Island, IL
Bid Date: Feb 02 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.