Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2026 at 8:00 PM

Updated June 10, 2026

Site work and paving for a mixed-use development in Saint Francis, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Work includes resurfacing portions of S Kansas Ave, S Vermont Ave, S Ellen St, and E Eden Pl in the City of St. Francis. Work involves full depth pulverization, full length or spot curb and gutter removal and replacement, sidewalk, carriage walk, and driveway replacement where necessary, and adjustment of storm sewer inlets, manholes, sanitary sewer manholes, and water valves along resurfaced streets. No proposal will be accepted unless accompanied by Bid security payable to the Owner in an amount of 5% of Bidders maximum Bid price in the form of a certified check or electronic Bid Bond issued by a qualifying surety. If the bidder fails to execute the contract within 15 days, the bid security may be forfeited as liquidated damages. No bidder may withdraw their bid within 60 days after opening. Minimum wages to be paid on the project shall comply with local wage rates. The Owner reserves the right to waive informalities or reject any or all bids. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. MSA Professional Services, Inc, Bill Pinnow, PE, (608) 421-7140, bpinnow@msa-ps.com Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Roads / Highways

$509,898.00

Public - City

Paving, Site Work

22

17

4

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
392
Active Projects
194
Bidding Soon
2,885
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 8, 2026

Project location map

Multiple Locations, Saint Francis, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed